Logo

Malouf Construction, LLC

Share

Greenwood, MS 38935

Company Info

  • Est. 1987
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Whether it’s turn key building construction, earthwork, pile driving, utilities, storm drainage, concrete paving, structural concrete work, steel erection, equipment installation, or a combination of some or all, Malouf Construction field forces are prepared and ready to go when and where the project calls. Both principles in the firm work experience prior to Malouf Construction were in the field and they understand that everyone else in the company is there to support field operations.

What We Do

Commercial Experience

Manufacturing Plant Misc Project
Civil & Site Development Design Build Industrial Maintenance Marine Utilities

Regions & Counties Serviced

  • Mississippi

Mississippi All

Tennessee All

Our CSI Codes

01 24 13 - Value Engineering
01 29 83 - Payment Procedures for Testing Laboratory Services
01 31 13 - Project Coordination
01 31 19.13 - Preconstruction Meetings
01 35 16 - Alteration Project Procedures
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 87 13 - Equipment Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.23 - Concrete Shaft Schedule
03 06 30.26 - Concrete Beam Schedule
03 08 00.00.01 - Commissioning of Concrete
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
04 08 00.00.01 - Commissioning of Masonry
06 13 33 - Heavy Timber Pier Construction
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 06 20.13 - Trench Dimension Schedule
31 06 60.13 - Driven Pile Schedule
31 06 60.16 - Caisson Schedule
31 09 16.23 - Driven Pile Load Tests
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 21 16.13 - Methane Venting
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 62 13.13 - Cast-in-Place Concrete Piles
31 63 16 - Auger Cast Grout Piles
31 63 19.13 - Rock Sockets for Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 63 26 - Drilled Caissons
31 63 26.13 - Fixed End Caisson Piles
31 63 26.16 - Concrete Caissons for Marine Construction
31 63 29 - Drilled Concrete Piers and Shafts
31 63 29.13 - Uncased Drilled Concrete Piers
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 01 70 - Operation and Maintenance of Dams
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 05 70 - Common Work Results for Dams
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 06 70 - Schedules for Dams
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 37 - Riprap Scour Protection
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 43 - Underwater Foundation Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 71 19 - Rockfill Gravity Dams
35 72 13 - Concrete Arch Dams
35 73 13 - Earth Embankment Dam
35 73 16 - Rock Embankment Dams
35 74 13 - Concrete Buttress Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
40 23 36 - Sanitary Water Process Piping

Gallery

Featured Image 1
Veterans Memorial Cemetery
Featured Image 2
Mitsubishi Electrical Power
Service Area and Locations Map for Malouf Construction, LLC
Share URL copied!
https://www.thebluebook.com/iProView/1429924/malouf-construction-llc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.