128th Refueling Wing (Repair Air Field Apron)

Project Information

Project Location:
Milwaukee, WI
Approx Contract:
$700,000
Status:
Completed - Oct 2015
Structure Type:
Military

References

General Contractor:
KPH Construction Corp.

Scope Of Work

The project consisted of:

  • Partial depth repairs of concrete pavement: 50 sq. ft.
  • Full depth repairs of concrete pavement: 836 sq. ft.
  • Re-seal existing concrete joints: 65,005 linear feet
  • Route and seal cracks in PCC: 42 linear feet
  • Existing joint surface tolerance check and grinding: 19,500 linear feet
  • Remove and replace bituminous pavement: 29 sq. yards
  • Remove and replace crushed aggregate base course: 10 cubic yards
  • Bituminous sawcut: 80 linear feet
  • Misc. pavement markings: 3,285 sq. ft.
  • Coordination of work onsite to maintain an open and active Parking Apron.

A major issue was a region wide cement shortage. Due to large projects in the area and a lag in restocking, the require cement component of the concrete mixture was at a severe shortage. This was cause for a temporary suspension of work to avoid winter conditions and allow the cement shortage to catch up. Work then began again that following spring with no further issues or delays other than funding approval for additional work to be completed.   

The main challenge was coordination of work with base personnel to maintain an active and safe ramp. Close and constant communication allowed for smooth and efficient coordination throughout the project. There were no major issues with coordination between KPH and base personnel.

Share URL copied!
https://www.thebluebook.com/iProView/1277049/kph-construction-environmental/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.