Logo

Morgan Mechanical Contractors, Inc.

Share

Eden, NC 27288

Company Info

  • Est. 1971
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Specializing In Industrial, Commercial Mechanical, and Electrical Services Since 1971

Morgan Mechanical Contractors, Inc specializes in Industrial / Commercial / Mechanical and Plumbing Services. For many years, Morgan Mechanical Contractors has been a proud leader in the growth and expansion of the Triad area. It’s through our honesty, dedication to quality, and commitment to service that we have developed many long lasting relationships with our customers.

Company Background

Morgan Mechanical Contractors, Inc. was founded in 1971 by Jack and Jessie Morgan. To this day, the company remains in the Morgan family.

Morgan Mechanical specializes in Industrial, Commercial, Mechanical, and Plumbing Services. Our journeymen are among the most highly skilled craftsmen in North Carolina. They take pride in providing quality workmanship with prompt service at competitive prices.

Morgan Mechanical Contractors, Inc. is affiliated with the following Associations:

MCAA - Mechanical Contractors Association of America

NFPA - National Fire Protection Association

Morgan Mechanical offers design build services and provides customers with over 30 years of experience in the mechanical industry. This capability allows our company to assist the customer in achieving their design goals and bestows the satisfaction of dealing with one contractor to supply all of their needs. This concept offers value engineering not realized using multiple contractors. Our Mechanical and Plumbing Divisions work closely together to produce the final product on schedule and on budget.

What We Do

Commercial Experience

Misc Project
Manufacturing Plant

Regions & Counties Serviced

  • North Carolina and Upstate South Carolina

North Carolina All

South Carolina All

Tennessee All

Virginia All

Our CSI Codes

01 21 23 - Installation Allowances
01 73 19 - Installation
01 74 13 - Progress Cleaning
01 74 23 - Final Cleaning
01 78 19 - Maintenance Contracts
01 78 23.19 - Preventative Maintenance Instructions
01 93 13 - Facility Maintenance Procedures
02 01 80 - Maintenance of Facility Remediation
21 01 10 - Operation and Maintenance of Water-Based Fire-Suppression Systems
21 01 30 - Operation and Maintenance of Fire-Suppression Equipment
21 05 16 - Expansion Fittings and Loops for Fire-Suppression Piping
21 06 10 - Schedules for Water-Based Fire-Suppression Systems
21 10 00.00.01 - Water-Based Fire-Suppression Systems
21 13 13 - Wet-Pipe Sprinkler Systems
21 13 16 - Dry-Pipe Sprinkler Systems
21 13 19 - Preaction Sprinkler Systems
21 13 23 - Combined Dry-Pipe and Preaction Sprinkler Systems
21 13 26 - Deluge Fire-Suppression Sprinkler Systems
21 13 29 - Water Spray Fixed Systems
21 13 36 - Antifreeze Sprinkler Systems
21 13 39 - Foam-Water Systems
21 21 13 - Carbon-Dioxide Fire-Extinguishing Piping
21 22 13 - Clean-Agent Fire-Extinguishing Piping
21 22 16 - Clean-Agent Fire-Extinguishing Equipment
21 23 13 - Wet-Chemical Fire-Extinguishing Piping
21 23 16 - Wet-Chemical Fire-Extinguishing Equipment
21 24 13 - Dry-Chemical Fire-Extinguishing Piping
22 01 10 - Operation and Maintenance of Plumbing Piping and Pumps
22 01 30 - Operation and Maintenance of Plumbing Equipment
22 01 40 - Operation and Maintenance of Plumbing Fixtures
22 01 60 - Operation and Maintenance of Laboratory and Healthcare Systems
22 06 10 - Schedules for Plumbing Piping and Pumps
22 06 10.13 - Plumbing Pump Schedule
22 06 30.13 - Domestic Water Heater Schedule
22 06 60 - Schedules for Laboratory and Healthcare Systems
22 10 00.00.01 - Plumbing Piping and Pumps
22 11 13 - Facility Water Distribution Piping
22 13 19.13 - Sanitary Drains
22 15 13 - General Service Compressed-Air Piping
22 60 00.00.01 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 61 13 - Compressed-Air Piping for Laboratory and Healthcare Facilities
22 61 13.53 - Laboratory Compressed-Air Piping
22 61 13.70 - Healthcare Compressed-Air Piping
22 61 13.74 - Dental Compressed-Air Piping
22 61 19.70 - Healthcare Compressed-Air Equipment
22 62 13 - Vacuum Piping for Laboratory and Healthcare Facilities
22 62 13.53 - Laboratory Vacuum Piping
22 62 13.70 - Healthcare, Surgical Vacuum Piping
22 62 13.74 - Dental Vacuum Piping
22 62 23 - Waste Anesthesia-Gas Piping
22 63 13 - Gas Piping for Laboratory and Healthcare Facilities
22 63 13.53 - Laboratory Gas Piping
22 63 13.70 - Healthcare Gas Piping
22 66 53 - Laboratory Chemical-Waste and Vent Piping
22 66 70 - Healthcare Chemical-Waste and Vent Piping
22 66 83 - Chemical-Waste Tanks
22 67 13 - Processed Water Piping for Laboratory and Healthcare Facilities
22 67 13.13 - Distilled-Water Piping
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 10 - Schedules for Facility Fuel Service Systems
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 50.13 - Heating Boiler Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 10 00.00.01 - Facility Fuel Systems
23 11 13 - Facility Fuel-Oil Piping
23 11 23 - Facility Natural-Gas Piping
23 20 00.00.01 - HVAC Piping and Pumps
23 21 13.23 - Aboveground Hydronic Piping
23 22 13 - Steam and Condensate Heating Piping
23 22 13.23 - Aboveground Steam and Condensate Heating Piping
23 24 16 - Internal-Combustion Engine Exhaust Piping
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
40 01 10 - Operation and Maintenance of Gas and Vapor Process Piping
40 01 20 - Operation and Maintenance of Liquids Process Piping
40 01 40 - Operation and Maintenance of Process Piping and Equipment Protection
40 05 13 - Common Work Results for Process Piping
40 05 13.13 - Steel Process Piping
40 05 13.16 - Lined or Internally-Coated Steel Process Piping
40 05 13.19 - Stainless-Steel Process Piping
40 05 13.23 - Aluminum Alloys Process Piping
40 05 13.33 - Brass, Bronze, Copper, and Copper Alloys Process Piping
40 05 13.43 - Nickel and Nickel Alloys Process Piping
40 05 13.53 - Ductile, Malleable, and Cast Iron Alloys Process Piping
40 05 13.63 - Titanium and Titanium Alloys Process Piping
40 05 13.73 - Plastic Process Piping
40 05 13.76 - Fiberglass-Reinforced Plastic and Resins Process Piping
40 05 13.93 - Other Metals Process Piping
40 06 10 - Schedules for Gas and Vapor Process Piping
40 06 20 - Schedules for Liquids Process Piping
40 06 30 - Schedules for Solid and Mixed Materials Piping and Chutes
40 06 40 - Schedules for Process Piping and Equipment Protection
40 10 00.00.01 - Gas and Vapor Process Piping
40 11 13 - Low-Pressure Steam Process Piping
40 11 16 - Intermediate-Pressure Steam Process Piping
40 11 19 - High-Pressure Steam Process Piping
40 11 23 - Condensate Process Piping
40 12 13 - Breathing Compressed Air Process Piping
40 12 16 - Non-Breathing Compressed Air Process Piping
40 13 13 - Argon Process Piping
40 13 16 - Carbon-Dioxide Process Piping
40 13 19 - Helium Process Piping
40 13 23 - Krypton Process Piping
40 13 26 - Neon Process Piping
40 13 29 - Nitrogen Process Piping
40 13 33 - Xenon Process Piping
40 13 93 - Mixed Inert Gases Process Piping
40 14 16 - Blue (Water) Fuel Gas Piping
40 14 19 - Butane Piping
40 14 23 - Carbon-Monoxide Piping
40 14 26 - Chlorine Fuel Gas Piping
40 14 33 - Ethane-Gas Piping
40 14 36 - Hydrogen Fuel Gas Piping
40 14 39 - Liquid Natural-Gas Process Piping
40 14 43 - Methylacetylene-Propadiene Fuel Gas Piping
40 14 49 - Natural-Gas Process Piping
40 14 49.13 - Synthetic Natural-Gas Piping
40 14 49.23 - Propane-Air Mixes Fuel Gas Piping
40 14 53 - Octane Fuel Gas Piping
40 14 59 - Propane Fuel Gas Process Piping
40 14 63 - Sewage Fuel Gas Piping
40 14 93 - Mixed Fuel Gases Piping
40 15 13 - Combustion Air Piping
40 15 16 - Oxygen Combustion System Gas Piping
40 15 23 - Exothermic-Gas Combustion System Piping
40 15 26 - Endothermic-Gas Combustion System Piping
40 15 29 - Disassociated-Ammonia-Gas Combustion System Piping
40 16 13 - Ammonia Gas Piping
40 16 16 - Boron Gas Piping
40 16 26 - Diborane Gas Piping
40 16 29 - Fluorine Gas Piping
40 16 33 - Hydrogen Sulfide Gas Piping
40 16 36 - Nitrous-Oxide Gas Process Piping
40 16 39 - Ozone Gas Piping
40 16 43 - Phosphine Gas Piping
40 16 46 - Silane Gas Piping
40 16 49 - Sulfur-Dioxide Gas Piping
40 16 53 - Specialty Gas Mixtures Piping
40 18 13 - Low-Vacuum Systems Process Piping
40 18 16 - High-Vacuum Systems Process Piping
40 20 00.00.01 - Liquids Process Piping
40 21 13 - Bio Fuels Process Piping
40 22 16 - Light-Fractions Petroleum Products Piping
40 23 13 - De-Ionized Water Process Piping
40 23 16 - Distilled-Water Process Piping
40 23 19 - Process Plant Water Piping
40 23 23 - Potable Water Process Piping
40 23 29 - Recirculated Water Process Piping
40 23 33 - Reverse-Osmosis Water Process Piping
40 24 13 - Alcohol Piping
40 24 16 - Gel Piping
40 24 19 - Slurries Process Piping
40 24 23 - Thixotropic Liquid Piping
40 25 13 - Liquid Acids Piping
40 25 16 - Liquid Bases Piping
40 26 00.00.01 - Liquid Polymer Piping
40 95 73 - Process Control Wiring
41 01 30 - Operation and Maintenance of Manufacturing Equipment
41 01 40 - Operation and Maintenance of Container Processing and Packaging
41 01 60 - Operation and Maintenance of Mobile Plant Equipment
41 06 40 - Schedules for Container Processing and Packaging
41 06 50 - Schedules for Material Storage
41 06 60 - Schedules for Mobile Plant Equipment
41 08 10 - Commissioning of Bulk Material Processing Equipment
41 08 20 - Commissioning of Piece Material Handling Equipment
41 08 40 - Commissioning of Container Processing and Packaging
41 08 50 - Commissioning of Material Storage
41 08 60 - Commissioning of Mobile Plant Equipment
41 24 39 - Railcar Movers
43 01 30 - Operation and Maintenance of Gas and Liquid Hi-Purification Equipment

Project Experience

  • Public
  • Private
  • Projects From $20,000 to $1,000,000

Gallery

Fed Ex Ground Colfax, NC
Fed Ex Ground Colfax, NC
Service Area and Locations Map for Morgan Mechanical Contractors, Inc.

Associations & Memberships

NFPA (National Fire Protection Assn.)
NFPA (National Fire Protection Assn.)
AGC (Associated General Contractors)
AGC (Associated General Contractors)
MCAA (Mechanical Contractors  Assn. of America)
MCAA (Mechanical Contractors Assn. of America)
NECA (National Electrical Contractors Assn.)
NECA (National Electrical Contractors Assn.)
HUB (Statewide Historically Underutilized Business) of North Carolina
HUB (Statewide Historically Underutilized Business) of North Carolina

Preferred Brands

BlazeMaster Fire Sprinkler Systems
BlazeMaster Fire Sprinkler Systems
Share URL copied!
https://www.thebluebook.com/iProView/388199/morgan-mechanical-contractors-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.