Logo

Subsurface Construction Group Inc.

Staten Island, NY 10306

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Foundation Contractors--Concrete & Block, Foundation Contractors--Geotechnical, Mason Contractors, Brickfacing & Stonefacing, Waterproofing Contractors, Shoring Contractors.

We are located in the Staten Island, New York area.

What We Do

  • Foundation Contractors--Concrete & Block
  • Foundation Contractors--Geotechnical
  • Grouting--Pressure

Commercial Experience

Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Non-Building Construction Non-Residential Building Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Residential Building Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tract Housing Tunnel Utilities

Regions & Counties Serviced

  • New York City, Long Island and Hudson Valley

Connecticut All

New Jersey All

New York All

Our CSI Codes

01 53 26 - Temporary Runarounds
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 73 23 - Bracing and Anchoring
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
02 57 16 - Sinkhole Remediation by Backfilling
02 58 16 - Snow Avalanche Control
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 01 70 - Maintenance of Mass Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 06 60 - Schedules for Grouting
03 06 70 - Schedules for Mass Concrete
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
03 37 23 - Roller-Compacted Concrete
03 47 16 - Lift-Slab Concrete
03 61 13 - Dry-Pack Grouting
03 62 13 - Non-Metallic Non-Shrink Grouting
03 62 16 - Metallic Non-Shrink Grouting
03 64 23 - Epoxy Injection Grouting
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
04 01 20 - Maintenance of Unit Masonry
04 01 20.51 - Unit Masonry Maintenance
04 01 60 - Maintenance of Corrosion-Resistant Masonry
04 01 70 - Maintenance of Manufactured Masonry
04 05 16 - Masonry Grouting
04 06 20 - Schedules for Unit Masonry
04 06 20.13 - Masonry Unit Schedule
04 06 60 - Schedules for Corrosion-Resistant Masonry
04 06 70 - Schedules for Manufactured Masonry
04 21 13.13 - Brick Veneer Masonry
04 24 16 - Manufactured Adobe Unit Masonry
04 25 13 - Metal-Supported Unit Masonry Panels
04 42 13 - Masonry-Supported Stone Cladding
04 42 16 - Steel-Stud-Supported Stone Cladding
04 42 19 - Strongback-Frame-Supported Stone Cladding
04 42 23 - Truss-Supported Stone Cladding
04 42 26 - Grid-System-Supported Stone Cladding
04 42 43 - Stone Panels for Curtain Walls
04 57 00.00.01 - Masonry Fireplaces
04 70 00.00.01 - Manufactured Masonry
04 71 13 - Calcium Silicate Manufactured Brick Masonry
04 73 13 - Calcium Silicate Manufactured Stone Masonry
07 01 10 - Maintenance of Dampproofing and Waterproofing
07 06 10 - Schedules for Dampproofing and Waterproofing
09 75 00.00.01 - Stone Facing
10 74 43 - Below-Grade Egress Assemblies
12 11 16 - Sculptured Brick Panels
12 11 23 - Brick Murals
31 01 40 - Maintenance of Shoring and Underpinning
31 01 63 - Maintenance of Bored and Augered Piles
31 01 63.61 - Bored and Augered Pile Repairs
31 01 70.61 - Tunnel Leak Repairs
31 06 20.13 - Trench Dimension Schedule
31 06 40 - Schedules for Shoring and Underpinning
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 22 16.13 - Roadway Subgrade Reshaping
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
31 32 23 - Pressure Grouting Soil Stabilization
31 32 23.13 - Cementitious Pressure Grouting Soil Stabilization
31 32 23.16 - Chemical Pressure Grouting Soil Stabilization
31 32 36 - Soil Nailing
31 32 36.13 - Driven Soil Nailing
31 32 36.16 - Grouted Soil Nailing
31 32 36.19 - Corrosion-Protected Soil Nailing
31 32 36.23 - Jet-Grouted Soil Nailing
31 32 36.26 - Launched Soil Nailing
31 33 13 - Rock Bolting and Grouting
31 40 00.00.01 - Shoring and Underpinning
31 41 16 - Sheet Piling
31 41 16.13 - Steel Sheet Piling
31 41 16.16 - Plastic Sheet Piling
31 43 13 - Pressure Grouting
31 43 13.13 - Concrete Pressure Grouting
31 43 13.16 - Polyurethane Pressure Grouting
31 43 16 - Compaction Grouting
31 43 19 - Mechanical Jacking
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 13 - Cantilever Needle Beams
31 48 13 - Underpinning Piers
31 48 19 - Bracket Piers
31 48 23 - Jacked Piers
31 48 33 - Micropile Underpinning
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 54 00.00.01 - Ground Freezing
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 62 13 - Concrete Piles
31 62 13.16 - Concrete Displacement Piles
31 62 13.19 - Precast Concrete Piles
31 62 13.23 - Prestressed Concrete Piles
31 62 13.26 - Pressure-Injected Footings
31 62 16 - Steel Piles
31 62 16.13 - Sheet Steel Piles
31 62 16.16 - Steel H Piles
31 62 16.19 - Unfilled Tubular Steel Piles
31 62 19 - Timber Piles
31 62 23 - Composite Piles
31 62 23.13 - Concrete-Filled Steel Piles
31 62 23.16 - Wood and Cast-In-Place Concrete Piles
31 63 13 - Bored and Augered Test Piles
31 63 19 - Bored and Socketed Piles
31 66 13 - Special Piles
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
31 75 13 - Cast-in-Place Concrete Shaft Lining
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 01 13 - Operation and Maintenance of Roadways
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 43 - Schedules for Bridges
34 82 19.13 - Bridge Pier Ice Shields
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 42 13 - Piling Bank Protection
35 42 13.19 - Steel Sheet Piling Bank Protection
35 42 13.23 - Timber Piling Bank Protection
35 42 13.26 - Plastic Piling Bank Protection
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 49 13.16 - Masonry Floodwalls
35 59 13.13 - Prestressed Concrete Marine Fender Piling
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 73 13 - Earth Embankment Dam
35 74 13 - Concrete Buttress Dams

Project Experience

  • Union
  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
Share URL copied!
https://www.thebluebook.com/iProView/998080/subsurface-construction-group-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.