Logo

L.H. Woods & Sons, Inc.

Vista, CA 92081

Company Info

  • Est. 1962
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

A reliable water supply — it’s an absolute essential to keeping Southern California’s infrastructure running smoothly. So when Aqueducts begin to show the unmistakable signs of age-related deterioration, or new aqueduct systems require construction, firms like L. H. Woods & Sons, Inc. are engaged by public agencies to perform the construction.

LHWS, is a family-owned, third-generation general engineering contracting company based in Vista and primarily focused on serving the growing Southern California region’s expanding needs.

LHWS Specializes in the construction and rehabilitation of large-diameter pipelines. LHWS’ broad spectrum of expertise includes waterlines, water storage reservoirs, pump stations, tunnels, concrete encasement of live aqueducts, rehabilitation of large-diameter PCCP pipelines by installing steel liner pipe, valve vaults, complex mechanical systems, chlorination systems, road construction, sewer installations, storm drain construction, and cleaning and field cement mortar lining of large diameter waterlines with specialized equipment — providing the vital pipelines with the much-needed protection from corrosion.

THREE GENERATIONS OF EXCELLENCE

LHWS is known for its construction of large diameter pipelines and aqueduct systems and has constructed a large percentage of the pipelines and aqueduct systems in Southern California including the Inland Feeder Riverside Pipeline North (MWD) that included 8.5 miles of 144” steel water pipe; Inland Feeder Highland Pipeline (MWD) that included 5.25 miles of 144” steel water pipe; Sand Canyon Pipeline (Castaic Lake Water Agency) that included 5 miles of 48” steel water pipe; and Pipeline 4B Schedule 1 and 2 (SDCWA) that included 8.4 miles of 96” steel water pipe.

A recognized expert in rehabilitating older pipelines, today’s LHWS is, interestingly enough, at times being called upon to retrofit and rehabilitate some of the very same pipelines constructed by the company’s founder, Lee H. Woods, and his crews five decades ago. Projects like these provide a thread of continuity from the past to the present for employees and consumers alike, a reminder of the company’s unbroken commitment to excellence, innovation, and providing the finest quality materials and service available, as it has since its inception in 1958.

Originally formed as a partnership between Lee H. Woods and his son, James D. Woods Sr., to bid on the construction of a section of the San Diego Aqueduct from Black Mountain to the Lower Otay reservoir, LHWS was ultimately incorporated in 1962 as a general engineering contracting company. This father-son partnership flourished, with each man contributing key elements that contributed to the new company’s success. Prior to founding LHWS, Lee Woods was already an experienced and successful entrepreneur in the construction business: Along with Harry Heisler, a dozen years earlier he’d started Heisler and Woods, Contractors, Crane and Rigging, which grew into one of the West Coast’s largest crane rental companies by 1958, when the two men sold the business. Having worked for the family company while growing up, James D. Woods Sr. began working with his Father full time following his return from the Korean War, both as a crane operator and as a foreman constructing storm drains, sewers and water pipelines. In his late-20s when LHWS was founded, James D. Woods Sr. also had an engineering education from Cal Poly San Luis Obispo, thereby possessing the knowledge and ability to run the field as well as to handle the required public works paperwork.

With the passing of Lee Woods in the mid-1960s, James D. Woods Sr. remained the owner and president of LHWS until 1998, when he retired and passed the family business on to his son, James D. Woods Jr. Having worked for the company during his summers in high school, James D. Woods Jr. was no stranger to the business — in fact, he’d worked his way up from a field laborer into a management position, giving him an excellent knowledge base of all aspects of underground construction. After graduating from San Diego State University in 1983, he joined the LHWS team full time, stepping ably into the position of president and owner a decade ago.

What We Do

Commercial Experience

Civil & Site Development Golf Course Government Utilities
Industrial Maintenance Manufacturing Plant Misc Project Non-Building Construction

Regions & Counties Serviced

  • San Diego and Imperial Counties

Arizona All

California All

Nevada All

Our CSI Codes

33 06 50 - Schedules for Fuel Distribution Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
35 53 33 - Underwater Pipeline Construction
43 01 10 - Operation and Maintenance of Gas Handling Equipment
43 01 20 - Operation and Maintenance of Liquid Handling Equipment

Project Experience

  • Union
  • Public
  • Private
  • Projects From $2 to $2,000,000,000

Gallery

Featured Image 1
San Diego County Water Authority Pipelines 3, 4, and 4A Relining (I-15 Widening)
Featured Image 2
Jackson Drive Crossover Emergency Connection
Featured Image 3
Jackson Drive Crossover Emergency Connection
Featured Image 4
Jackson Drive Crossover Emergency Connection

Associations & Memberships

APWA (American Public Works Assn.)
APWA (American Public Works Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/955486/l-h-woods-sons-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.