Logo

Fincham Soil Investigations

Chardon, OH 44024

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

James R Fincham is the owner and primary Certified Professional Soil Scientist of Fincham Soil Investigations. He is 68 years young and is driven to apply knowledge of Soils Science in as professional a manner as possible as it relates to use of soils as a medium in which septic effluent can be treated and dissipated effectively.

Fincham Soil Investigations has been doing business in Northeast Ohio since 1986. Much has changed in since 1986. Understanding of soils, how to read soil characteristics, what they mean and how they affect the operation of septic systems has grown exponentially.

Fincham Soil Scientists have been involved in every aspect of these changes to the point of doing original experimentation in how septic systems can be renovated in lieu of total replacement.

What We Do

Commercial Experience

Airport Runway Arena / Stadium Auto Dealership / Service Casinos Church / Synagogue City / Town Hall Civil & Site Development Club House / Community Center Court House Dams & Levies Data Centers - Mission Critical Design Build Education (K-12) Fire / Police Station Fitness Center Gas Station Golf Course Government Grocery Stores Historic Preservation Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Military Mixed Use Museum Non-Building Construction Non-Residential Building Office Building Parking Garage Parking Lots Post Office Power Generation & Distribution Pre-Manufactured Structures Radio / Television Station Renewable Energy Residential Building Restaurant Retail Store Road / Highway School / College / University Secure and Shielded Facilities Sewage / Water Treatment Plant Single Family Residential Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Theme Park Tract Housing Tunnel Utilities

Regions & Counties Serviced

  • Cleveland - Northeastern Ohio

Ohio 1

  • Geauga

Our CSI Codes

01 78 29 - Final Site Survey
02 20 00.00.01 - Assessment
02 24 13.73 - Land Assessment
02 24 23 - Chemical Sampling and Analysis of Soils
02 25 16.13 - Concrete Assessment Drilling
02 32 13 - Subsurface Drilling and Sampling
02 54 13 - Aerobic Processes Decontamination
02 54 16 - Anaerobic Processes Decontamination
22 13 53 - Facility Septic Tanks
31 09 13.13 - Groundwater Monitoring During Construction
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 72 13 - Rock Reinforcement and Initial Support
32 11 33 - Cement-Treated Base Courses
32 32 34 - Reinforced Soil Retaining Walls
32 70 00.00.01 - Wetlands
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 36 13 - Utility Septic Tank and Effluent Wet Wells
33 36 16 - Utility Septic Tank Effluent Pumps
33 36 33 - Utility Drainage Field
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection

Gallery

Featured Image 1
Soil Testing
Featured Image 2
Soil Testing
Featured Image 3
Soil Testing
Featured Image 4
Soil Testing
Share URL copied!
https://www.thebluebook.com/iProView/935268/fincham-soil-investigations/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.