Logo

Hot Rod Mechanical, Inc.

Austin, TX 78702

Company Info

  • Est. 1999
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Hot Rod Mechanical provides comprehensive service throughout the Austin area, including:

  • Design-Build
  • Plan-and-Spec
  • Commercial Construction
  • Industrial Construction

With decades of experience, we specialize in providing thorough consultation and exceptional installation for projects of all types and sizes. 

What We Do

Commercial Experience

Fire / Police Station Government Hotel / Motel Misc Project Restaurant School / College / University
Apartments & Condominiums Assisted Living Bank Church / Synagogue Civil & Site Development Gas Station Grocery Stores Hospital / Nursing Home House Industrial Maintenance Manufacturing Plant Mixed Use Non-Building Construction Non-Residential Building Office Building Residential Building Retail Store Single Family Residential Storage Facility / Warehouse

Regions & Counties Serviced

  • San Antonio and Austin

Texas 41

  • Bandera
  • Bastrop
  • Bell
  • Bexar
  • Blanco
  • Bosque
  • Brazos
  • Burleson
  • Burnet
  • Caldwell
  • Comal
  • Comanche
  • Coryell
  • Falls
  • Fayette
  • Freestone
  • Gillespie
  • Gonzales
  • Guadalupe
  • Hamilton
  • Hays
  • Hill
  • Kendall
  • Kerr
  • Kimble
  • Lampasas
  • Lee
  • Leon
  • Limestone
  • Llano
  • Madison
  • Mason
  • Mclennan
  • Milam
  • Mills
  • Robertson
  • San Saba
  • Travis
  • Washington
  • Williamson
  • Wilson

Our CSI Codes

23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 05 13 - Common Motor Requirements for HVAC Equipment
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50.13 - Heating Boiler Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 20 00.00.01 - HVAC Piping and Pumps
23 30 00.00.01 - HVAC Air Distribution
23 31 16.13 - Fibrous-Glass Ducts
23 31 16.16 - Thermoset Fiberglass-Reinforced Plastic Ducts
23 36 13 - Constant-Air-Volume Units
23 36 16 - Variable-Air-Volume Units
23 50 00.00.01 - Central Heating Equipment
23 52 33.19 - Copper Water-Tube Boilers
23 52 13 - Electric Boilers
23 52 16 - Condensing Boilers
23 52 16.13 - Stainless-Steel Condensing Boilers
23 52 16.16 - Aluminum Condensing Boilers
23 52 19 - Pulse Combustion Boilers
23 52 23 - Cast-Iron Boilers
23 52 33 - Water-Tube Boilers
23 52 33.13 - Finned Water-Tube Boilers
23 52 33.16 - Steel Water-Tube Boilers
23 52 39 - Fire-Tube Boilers
23 52 39.13 - Scotch Marine Boilers
23 52 39.16 - Steel Fire-Tube Boilers
23 53 16 - Deaerators
23 57 19 - Liquid-to-Liquid Heat Exchangers
23 57 19.13 - Plate-Type, Liquid-to-Liquid Heat Exchangers
23 57 19.16 - Shell-Type, Liquid-to-Liquid Heat Exchangers
23 64 26 - Rotary-Screw Water Chillers
23 65 13 - Forced-Draft Cooling Towers
23 65 13.13 - Open-Circuit, Forced-Draft Cooling Towers
23 65 13.16 - Closed-Circuit, Forced-Draft Cooling Towers
23 65 16 - Natural-Draft Cooling Towers
23 65 23 - Field-Erected Cooling Towers
23 70 00.00.01 - Central HVAC Equipment
23 72 13 - Heat-Wheel Air-to-Air Energy-Recovery Equipment
23 72 16 - Heat-Pipe Air-to-Air Energy-Recovery Equipment
23 72 19 - Fixed-Plate Air-to-Air Energy-Recovery Equipment
23 72 23 - Packaged Air-to-Air Energy-Recovery Units
23 73 13 - Modular Indoor Central-Station Air-Handling Units
23 73 23 - Custom Indoor Central-Station Air-Handling Units
23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units
23 74 23.13 - Packaged, Direct-Fired, Outdoor, Heating-Only Makeup-Air Units
23 74 23.16 - Packaged, Indirect-Fired, Outdoor, Heating-Only Makeup-Air Units
23 74 33 - Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners
23 75 13 - Custom-Packaged, Outdoor, Central-Station Air-Handling Units
23 75 23 - Custom-Packaged, Outdoor, Heating and Ventilating Makeup-Air Units
23 75 33 - Custom-Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners
23 80 00.00.01 - Decentralized HVAC Equipment
23 81 13 - Packaged Terminal Air-Conditioners
23 81 16 - Room Air-Conditioners
23 81 19 - Self-Contained Air-Conditioners
23 81 19.13 - Small-Capacity Self-Contained Air-Conditioners
23 81 19.16 - Large-Capacity Self-Contained Air-Conditioners
23 81 23 - Computer-Room Air-Conditioners
23 81 26 - Split-System Air-Conditioners
23 82 13 - Valance Heating and Cooling Units
23 82 16 - Air Coils
23 82 19 - Fan Coil Units
42 01 20 - Operation and Maintenance of Process Cooling Equipment
42 06 20 - Schedules for Process Cooling Equipment
42 11 13 - Low-Pressure Process Boilers
42 11 16 - Intermediate-Pressure Process Boilers
42 11 19 - High-Pressure Process Boilers
42 11 23 - Specialty Process Boilers
42 13 26 - Industrial Solar Radiation Heat Exchangers
42 21 13 - Open-Circuit Process Cooling Towers
42 21 16 - Closed-Circuit Process Cooling Towers
48 11 13 - Fossil Fuel Electrical Power Plant Boilers

Project Experience

  • Non-Union
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Service Work/Repairs

Gallery

Featured Image 1
Sanchez Elementary School
Featured Image 2
Services
Featured Image 3
Sanchez Elementary School
Featured Image 4
Services
Share URL copied!
https://www.thebluebook.com/iProView/840325/hot-rod-mechanical-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.