Featured Project Return to Projects List
Cumming Aquatic Center
Project Information
- Project Location:
- GA
- Status:
- Completed
- Structure Type:
- Misc Project
Scope Of Work
For this project, Optum completed the design and construction of the pre-engineered metal building system for the main aquatic center building (approx. 48,515sf) and the filter storage building (approx. 1,373). Work included shop painting, installation of structural steel, installation of the acoustical/structural deck system, wall panels, roofing, and more.