39 HIGH STREET

Project Location:
JERSEY CITY, NJ
Est Completion:
Oct 2021

References

Architect:
HAMPTON HILL ACHITECTURE
General Contractor:
KCI CONSTRUCTION GROUP, INC.

Scope Of Work

WATERPROOFING APPLICATION

  1. Complete application of STO emerald coat waterproofing over exterior areas only and on those areas beside the stucco areas.
  2. Complete installation of STO fabric membrane over dens-glass joints.

 

½” HARD COAT STUCCO SYSTEM

  1. Complete installation of ½” hard coat stucco system.
  2. Complete application of STO emerald coat waterproofing.
  3. Complete installation of control joints and plaster stops “j” channels.
  4. Expansion joints will be required to break big walls into small panels for easy to work with.
  5. Complete installation of wire lath mesh.
  6. Complete installation of scratch coat as first layer.
  7. Complete installation of hard coat as second layer.
  8. Complete application of synthetic stucco will be the third and final coat.

 

8” CMU BLOCK WALL INSTALLATION

  1. To install 8”x8”x16” CMU block as per specs.
  2. To install dur-o-wall wire every other course of CMU as per specs (@16” O.C.).
  3. To install #5 rebar every 24” o.c.  as per specs and schedule.
  4. To fill block cells every 24” as per specs.
  5. To install concrete lintel above doors as per specs.

 

BRICK VENEER INSTALLATION

  1. Installation of 4” Brick veneer as per specs at lobby area only (Interior).
  2. Installation of wall ties.
  3. Washing brick and clean up after installation.