Featured Project Return to Projects List
Norwich Technical HS – Biotechnical Lab
Project Information
- Project Location:
- Norwich, CT
- Status:
- Completed - Mar 2017
- Structure Type:
- Laboratory
References
- Architect:
- The S/L/A/M Collaborative
- Client:
- State of Connecticut, Department of Administrative Services
Scope Of Work
Diversity Construction Group was contracted to convert an existing space to create their new Biotechnical Laboratory. The space includes two Labs and one Prep Room equipped with state of the art lab tables, fume hood, emergency showers, and a -80 freezer.