Featured Project Return to Projects List
Safeway Milk Plant
Project Information
- Project Location:
- Tempe, AZ
- Status:
- Completed
- Structure Type:
- Manufacturing Plant
References
- Owner:
- Architect:
- General Contractor:
Scope Of Work
- Exterior of tank is to be first power washed using the minimum of 3,000 PSI.
- After power washing is complete and tank has dried, the exterior of the tank where rust appears is to be power tool cleaned per SSPC-SP-2 and then spot prime where necessary in DTM Primer.
- After power washing and spot priming is complete, the exterior of the tank is to be top coated in DTM.