Logo

Pinnacle Engineering & Development, Inc.

Coral Springs, FL 33065

Company Info

  • Est. 1998
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Formed in 1998, Pinnacle Engineering and Development is a Florida-based full-service Complete Sitework & Underground Utility Contractor.  We offer a wide range of services including:

Lake Excavation
De-Mucking
Hauling
Concrete
Grading
Paving
Stripe & Sign
Underground Utilities
Demolition
Sheet Piling
Crisis Management
Consulting
Fabrication

Our history is one of consistently performing all work at the highest of standards. We are a "Fast Track" company and capable of operating multiple, concurrent projects without diluting supervision, equipment or financial backing. Pinnacle is licensed and insured in the State of Florida.

At Pinnacle Engineering & Development, getting the job done right and on time is what we deliver!

What We Do

Commercial Experience

Regions & Counties Serviced

  • Florida-South-West Palm Beach, Miami, Naples

Florida All

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects From $2 to $2,000,000,000

Gallery

Featured Image 1
1100 gal. sediment tank #1
Featured Image 2
Water Main #1
Featured Image 3
Sewer #1
Featured Image 4
1100 gal. sediment tank #2
Share URL copied!
https://www.thebluebook.com/iProView/799675/pinnacle-engineering-development-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.