Logo

Lovell Marine Construction Inc.

Oakland Park, FL 33309

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Lovell Marine is a subsidiary of Lovell Built, Inc., a state certified licensed contractor, founded in 1995 by Rose Ann Lovell. Family owned and operated, Lovell Marine Construction is a full service, second generation marine services business dealing in all types of marine construction including docks, decks, boat lifts, seawalls, retaining walls, foundation pilings, marinas, dredging and barge rentals. The Lovell name is synonymous with consistency, quality and excellent service. We provide new installation and design as well as repairs. Today, the proud Lovell family tradition of quality construction started in 1955 by Ray O. Lovell is carried on by his daughter and son Rose Ann and William Lovell.

What We Do

Commercial Experience

Misc Project
Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Non-Building Construction Non-Residential Building Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Residential Building Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tract Housing Tunnel Utilities

Regions & Counties Serviced

  • Florida-South-West Palm Beach, Miami, Naples

Florida 19

  • Broward
  • Charlotte
  • Citrus
  • Collier
  • De Soto
  • Glades
  • Hardee
  • Hendry
  • Hernando
  • Highlands
  • Hillsborough
  • Lee
  • Manatee
  • Miami-dade
  • Palm Beach
  • Pasco
  • Pinellas
  • Polk
  • Sarasota

Our CSI Codes

03 01 70 - Maintenance of Mass Concrete
03 06 70 - Schedules for Mass Concrete
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
06 13 33 - Heavy Timber Pier Construction
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 06 60.13 - Driven Pile Schedule
31 09 16.23 - Driven Pile Load Tests
31 41 16 - Sheet Piling
31 41 16.13 - Steel Sheet Piling
31 41 16.16 - Plastic Sheet Piling
31 62 13 - Concrete Piles
31 62 13.13 - Cast-in-Place Concrete Piles
31 62 13.16 - Concrete Displacement Piles
31 62 13.19 - Precast Concrete Piles
31 62 13.23 - Prestressed Concrete Piles
31 62 16 - Steel Piles
31 62 16.13 - Sheet Steel Piles
31 62 16.16 - Steel H Piles
31 62 16.19 - Unfilled Tubular Steel Piles
31 62 19 - Timber Piles
31 62 23 - Composite Piles
31 62 23.13 - Concrete-Filled Steel Piles
31 62 23.16 - Wood and Cast-In-Place Concrete Piles
31 63 13 - Bored and Augered Test Piles
31 63 16 - Auger Cast Grout Piles
31 63 19 - Bored and Socketed Piles
31 63 19.13 - Rock Sockets for Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 63 33 - Drilled Micropiles
31 66 13 - Special Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
33 01 30.52 - Pond and Reservoir Maintenance
34 82 19.13 - Bridge Pier Ice Shields
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 01 50.71 - Channel Excavation, Cleaning and Deepening
35 05 30 - Common Work Results for Coastal Construction
35 05 40 - Common Work Results for Waterway Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 40 - Schedules for Waterway Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 20 23 - Dredging
35 20 23.13 - Mechanical Dredging
35 20 23.23 - Hydraulic Dredging
35 20 23.33 - Integrated Dredging and Dewatering
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 13 - Piling Bank Protection
35 42 13.19 - Steel Sheet Piling Bank Protection
35 42 13.23 - Timber Piling Bank Protection
35 42 13.26 - Plastic Piling Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 37 - Riprap Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 23 - Underwater Harbor Deepening
35 59 13 - Marine Fenders
35 59 13.13 - Prestressed Concrete Marine Fender Piling
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Projects From $2,000 to $300,000

Gallery

Featured Image 1
Barge Rental and Dredging
Featured Image 2
Boat Lift
Featured Image 3
Piling Installation and Relocation
Featured Image 4
Seawalls
Share URL copied!
https://www.thebluebook.com/iProView/797541/lovell-marine-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.