Logo

JCC Construction Corp.

Long Island City, NY 11101

Company Info

  • Est. 1990
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

JCC Construction Corp. has been in business since 1990.Our company specializes in complete site development, drainage, landscaping, tennis courts, parking lots, asphalt paving, sewer, dry well, water main and plumbing services.

 

What We Do

Commercial Experience

Misc Project
Park / Playground Utilities

Regions & Counties Serviced

  • New York City, Long Island and Hudson Valley

New York 5

  • Bronx
  • Kings
  • New York
  • Queens
  • Richmond

Our CSI Codes

01 53 26 - Temporary Runarounds
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 32 19 - Exploratory Excavations
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 58 16 - Snow Avalanche Control
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
03 37 23 - Roller-Compacted Concrete
11 68 23.33 - Tennis Equipment
11 92 23 - Agricultural Waste Clean-Up Equipment
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 14 13 - Facility Storm Drainage Piping
23 01 60.71 - Refrigerant Recovery/Recycling
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 16.13 - Roadway Subgrade Reshaping
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 18 23.43 - Recreational Court Surfacing
32 18 23.53 - Tennis Court Surfacing
32 18 23.56 - Natural Tennis Court Surfacing
32 18 23.59 - Synthetic Tennis Court Surfacing
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 10 - Operation and Maintenance of Water Utilities
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 09 10 - Instrumentation and Control for Water Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 01 13 - Operation and Maintenance of Roadways
34 01 33 - Operation and Maintenance of Airfields
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 33 - Common Work Results for Airports
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 33 - Schedules for Airfields
34 06 43 - Schedules for Bridges
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam

Project Experience

  • Union
  • Public
  • Private
  • Projects From $100,000 to $10,000,000

Gallery

Featured Image 1
Paving Contractors

Associations & Memberships

GCA (General Contractors Assn.) of New York
GCA (General Contractors Assn.) of New York
Share URL copied!
https://www.thebluebook.com/iProView/796886/jcc-construction-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.