Logo

NAVI Solutions

Malvern, PA 19355

Company Info

  • Est. 2019
  • Size 10-19 Employees

People Also View These
Loading...

Our Story

NAVI Solutions has a legacy founded on providing high quality pumping packages to commercial and industrial customers

The NAVI team has provided pumping systems, solutions, and expertise to commercial, industrial, and municipal clients throughout in the Mid-Atlantic States.  NAVI’s experience spans water pressure boosters, heat transfer, geothermal circulation, fuel oil transfer, wastewater systems and real-time industrial control solutions.

NAVI Solutions was founded on a 25 year legacy of commercial and industrial pumping systems.   The company’s expertise was built by providing pumping packages, control systems, and solutions to commercial, industrial, and municipal customers throughout the Mid-Atlantic States.

?NAVI’s background and experience spans water pressure boosters, heat transfer, geothermal circulation, fuel oil transfer, wastewater, building systems and real-time industrial control solutions.

NAVI integrates wireless alarm and control systems, delivers Hydraulic Institute Certified Assessment Services, configures and installs Variable Frequency Drives, and provides Engineering Services encompassing System Design, Efficiency, Controls & Instrumentation, and Hydraulic Pipe Modeling.

What We Do

Commercial Experience

Arena / Stadium Auto Dealership / Service Casinos Church / Synagogue City / Town Hall Club House / Community Center Education (K-12) Government Hospital / Nursing Home Hotel / Motel Manufacturing Plant Military Non-Residential Building School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Terminal - Airport / Bus / Railroad

Regions & Counties Serviced

  • Pennsylvania-Eastern

Delaware All

District Of Columbia All

New Jersey All

New York All

Pennsylvania All

Virginia All

West Virginia All

Our CSI Codes

01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
13 50 00.00.01 - Special Instrumentation
21 08 00.00.01 - Commissioning of Fire Suppression
22 05 13 - Common Motor Requirements for Plumbing Equipment
22 08 00.00.01 - Commissioning of Plumbing
22 11 23 - Domestic Water Pumps
22 11 23.13 - Domestic-Water Packaged Booster Pumps
22 11 23.23 - Close-Coupled, In-Line, Sealless Centrifugal Domestic-Water Pumps
22 11 23.26 - Close-Coupled, Horizontally Mounted, In-Line Centrifugal Domestic-Water Pumps
22 11 23.29 - Close-Coupled, Vertically Mounted, In-Line Centrifugal Domestic-Water Pumps
22 11 23.33 - Separately Coupled, In-Line Centrifugal Domestic-Water Pumps
22 11 23.36 - Separately Coupled, Horizontally Mounted, In-Line Centrifugal Domestic-Water Pumps
22 13 29 - Sanitary Sewerage Pumps
22 13 29.13 - Wet-Pit-Mounted, Vertical Sewerage Pumps
22 13 29.16 - Submersible Sewerage Pumps
22 13 29.23 - Sewerage Pump Reverse-Flow Assemblies
22 13 33 - Packaged, Submersible Sewerage Pump Units
22 14 19 - Sump Pump Discharge Piping
22 14 29 - Sump Pumps
22 14 29.13 - Wet-Pit-Mounted, Vertical Sump Pumps
22 14 29.16 - Submersible Sump Pumps
22 14 33 - Packaged, Pedestal Drainage Pump Units
22 14 36 - Packaged, Submersible, Drainage Pump Units
23 06 20.13 - Hydronic Pump Schedule
23 08 00.00.01 - Commissioning of HVAC
23 09 13 - Instrumentation and Control Devices for HVAC
23 09 13.13 - Actuators and Operators
23 09 13.23 - Sensors and Transmitters
23 09 23 - Direct-Digital Control System for HVAC
23 09 33 - Electric and Electronic Control System for HVAC
23 09 43 - Pneumatic Control System for HVAC
23 09 53 - Pneumatic and Electric Control System for HVAC
23 09 93 - Sequence of Operations for HVAC Controls
23 12 13 - Facility Fuel-Oil Pumps
23 21 23 - Hydronic Pumps
23 21 23.13 - In-Line Centrifugal Hydronic Pumps
23 21 23.16 - Base-Mounted, Centrifugal Hydronic Pumps
23 21 23.19 - Vertical-Mounted, Double-Suction Centrifugal Hydronic Pumps
23 21 23.23 - Vertical-Turbine Hydronic Pumps
23 21 29 - Automatic Condensate Pump Units
23 22 23 - Steam Condensate Pumps
23 22 23.13 - Electric-Driven Steam Condensate Pumps
23 22 23.23 - Pressure-Powered Steam Condensate Pumps
25 01 10 - Operation and Maintenance of Integrated Automation Network Equipment
25 01 20 - Operation and Maintenance of Integrated Equipment
25 01 30 - Operation and Maintenance of Integrated Automation Instrumentation and Terminal Devices
25 01 90 - Diagnostic Systems for Integrated Automation
25 05 53 - Identification for Integrated Automation
25 06 11 - Schedules for Integrated Automation Network
25 06 12 - Schedules for Integrated Automation Network Gateways
25 06 13 - Schedules for Integrated Automation Control and Monitoring Network
25 06 14 - Schedules for Integrated Automation Local Control Units
25 06 30 - Schedules for Integrated Automation Instrumentation and Terminal Devices
25 08 00.00.01 - Commissioning of Integrated Automation
25 30 00.00.01 - Integrated Automation Instrumentation and Terminal Devices
25 31 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Facility Equipment
25 35 19 - Integrated Automation Control Valves
25 35 26 - Integrated Automation Compressed Air Supply
25 36 19 - Integrated Automation Current Sensors
25 38 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Electronic Safety and Security Systems
25 50 00.00.01 - Integrated Automation Facility Controls
25 51 00.00.01 - Integrated Automation Control of Facility Equipment
25 55 00.00.01 - Integrated Automation Control of HVAC
25 56 00.00.01 - Integrated Automation Control of Electrical Systems
25 90 00.00.01 - Integrated Automation Control Sequences
25 91 00.00.01 - Integrated Automation Control Sequences for Facility Equipment
25 95 00.00.01 - Integrated Automation Control Sequences for HVAC
25 96 00.00.01 - Integrated Automation Control Sequences for Electrical Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
26 09 23 - Lighting Control Devices
26 09 36 - Modular Dimming Controls
26 09 36.13 - Manual Modular Dimming Controls
26 09 36.16 - Integrated Multipreset Modular Dimming Controls
26 09 43 - Network Lighting Controls
26 09 43.13 - Digital-Network Lighting Controls
26 09 43.16 - Addressable Fixture Lighting Control
26 24 19 - Motor-Control Centers
26 27 13 - Electricity Metering
27 08 00.00.01 - Commissioning of Communications
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 12 33 - Water Utility Metering
33 45 00.00.01 - Storm Utility Drainage Pumps
33 51 33 - Natural-Gas Metering
33 52 13.23 - Fuel-Oil Pumps
33 52 19.23 - Diesel Fuel Pumps
33 61 33 - Hydronic Energy Distribution Metering
33 63 33 - Steam Energy Distribution Metering
33 71 73 - Electrical Utility Services
33 71 73.33 - Electric Meters
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 43 26.13 - Airfield Lighting Control Equipment
34 43 26.16 - Airfield Lighting PLC Control Equipment
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
40 90 00.00.01 - Instrumentation and Control for Process Systems
40 92 49 - Variable Frequency Drives
40 94 23 - Distributed Process Control Systems
40 94 43 - Programmable Logic Process Controllers
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
43 11 26 - Gas Handling Jet Pumps
43 11 29 - Gas Handling Vacuum Pumps
43 20 00.00.01 - Liquid Handling Equipment
43 21 13 - Centrifugal Liquid Pumps
43 21 16 - Diaphragm Liquid Pumps
43 21 19 - Dispensing Liquid Pumps
43 21 23 - Drum Liquid Pumps
43 21 26 - Gear Liquid Pumps
43 21 29 - Metering Liquid Pumps
43 21 33 - Piston/Plunger Liquid Pumps
43 21 36 - Positive Displacement Liquid Pumps
43 21 39 - Submersible Liquid Pumps
43 21 43 - Sump Liquid Pumps
43 21 46 - Vane Liquid Pumps
44 08 40 - Commissioning Water Treatment Equipment
44 46 16 - Sludge Dewatering Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Private
  • Service Work/Repairs

Gallery

Featured Image 1
Services
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services

Associations & Memberships

ASPE (American Society of Professional Estimators)
ASPE (American Society of Professional Estimators)
Share URL copied!
https://www.thebluebook.com/iProView/795835/navi-solutions/manufacturers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.