San Diego Downtown Central Library

Project Information

Project Location:
San Diego, CA
Status:
Completed
Structure Type:
Library
LEED Certification (target):
Platinum

References

Owner:
Architect:
General Contractor:

Scope Of Work

  • Construction of this nine- story building with a soaring three story 300,000 square foot majestic dome will welcome visitors to the library scheduled to open to the public late September 2013.
  • It took over 1000 days of construction and 750,000 man hours to build the San Diego Downtown Central Library with zero lost time due to accidents.
  • General Coating's foreman RJ Conklin and his crew worked closely with Turner Construction on a daily basis. Factors that contributed to the success of this project were RJ's communication with Turner's superintendents and his knowledge of their schedule.  It took an average crew of six painters to produce work on both the interior and exterior.
  • Work on the exterior included using swing stage, scaffolding and man lifts to apply water repellant, anti-graffiti and miscellaneous painting.  The interior also needed scaffolding and lifts to reach the openness of the three story reading room, an open structured 350-seat auditorium, a special event center and a 400-seat multi-purpose room.
  • The Downtown Central Library was built to become a landmark of San Diego and General Coatings is proud to team up with Turner Construction to be part of this project. 
Share URL copied!
https://www.thebluebook.com/iProView/794843/general-coatings-corporation/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.