Logo

Current Electrical Contractors

Fullerton, CA 92832

Company Info

  • Est. 2009
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Electrical Contractors, Solar & Wind Energy Systems, Underground Utilities--Contractors.

Current Electrical Contractors has been listed in the Blue Book since 2009.

What We Do

Commercial Experience

Auto Dealership / Service School / College / University
Airport Runway Animal Hospital / Kennel Arena / Stadium Assisted Living Athletic Field Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Non-Building Construction Non-Residential Building Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Restaurant Retail Store Road / Highway Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tunnel Utilities

Regions & Counties Serviced

  • Orange, Riverside and San Bernardino Counties

California 6

  • Imperial
  • Los Angeles
  • Orange
  • Riverside
  • San Bernardino
  • San Diego

Our CSI Codes

13 01 50 - Operation and Maintenance of Special Instrumentation
13 06 50 - Schedules for Special Instrumentation
13 08 50 - Commissioning of Special Instrumentation
13 53 13 - Solar Instrumentation
13 53 23 - Wind Instrumentation
23 22 13.13 - Underground Steam and Condensate Heating Piping
23 56 13 - Heating Solar Collectors
23 56 13.13 - Heating Solar Flat-Plate Collectors
23 56 13.16 - Heating Solar Concentrating Collectors
23 56 13.19 - Heating Solar Vacuum-Tube Collectors
23 56 16 - Packaged Solar Heating Equipment
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 31 00.00.01 - Photovoltaic Collectors
26 32 23 - Wind Energy Equipment
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 01 10 - Operation and Maintenance of Structured Cabling and Enclosures
27 01 20 - Operation and Maintenance of Data Communications
27 05 13.23 - T1 Services
27 05 13.33 - DSL Services
27 05 13.43 - Cable Services
27 05 26 - Grounding and Bonding for Communications Systems
27 05 28 - Pathways for Communications Systems
27 06 10 - Schedules for Structured Cabling and Enclosures
27 06 20 - Schedules for Data Communications
27 06 30 - Schedules for Voice Communications
27 10 00.00.01 - Structured Cabling
27 11 23 - Communications Cable Management and Ladder Rack
27 13 13.13 - Communications Copper Cable Splicing and Terminations
27 13 23 - Communications Optical Fiber Backbone Cabling
27 13 23.13 - Communications Optical Fiber Splicing and Terminations
27 13 33 - Communications Coaxial Backbone Cabling
27 13 33.13 - Communications Coaxial Splicing and Terminations
27 13 43 - Communications Services Cabling
27 13 43.23 - T1 Services Cabling
27 13 43.33 - DSL Services Cabling
27 13 43.43 - Cable Services Cabling
27 15 00.16 - Voice Communications Horizontal Cabling
27 15 00.19 - Data Communications Horizontal Cabling
27 15 00.49 - Intermediate Frequency/Radio Frequency Communications Horizontal Cabling
27 15 13 - Communications Copper Horizontal Cabling
27 15 23 - Communications Optical Fiber Horizontal Cabling
27 15 33 - Communications Coaxial Horizontal Cabling
27 21 13 - Data Communications Firewalls
31 21 16.13 - Methane Venting
31 63 29.16 - Cased Drilled Concrete Piers
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 39.23 - Underground High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
33 81 23 - Aerial Cable Installation Hardware
33 82 13 - Copper Communications Distribution Cabling
33 82 13.13 - Copper Splicing and Terminations
33 82 23 - Optical Fiber Communications Distribution Cabling
33 82 23.13 - Optical Fiber Splicing and Terminations
33 82 33 - Coaxial Communications Distribution Cabling
33 82 33.13 - Coaxial Splicing and Terminations
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
34 43 23.16 - Airfield Wind Cones
40 23 36 - Sanitary Water Process Piping
40 95 33.13 - Cabled Process Control Networks
40 95 33.23 - Fiber Optic Process Control Networks
40 95 33.33 - Wireless Process Control Networks
40 95 73 - Process Control Wiring
42 12 23 - Solar Process Heaters
48 12 29 - Nuclear Fuel Electrical Power Plant Turbines
48 14 13 - Solar Energy Collectors
48 14 13.13 - Amorphous Solar Energy Collectors
48 14 13.16 - Plate Cell Solar Energy Collectors
48 14 13.19 - Vacuum Tube Solar Energy Collectors
48 15 13 - Windmills
48 15 16 - Wind Energy Electrical Power Generators
48 18 16 - Hydrogen Control Equipment
48 19 19 - Electrical Power Generation Solar Tracking Equipment

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • Projects Up to $250,000

Gallery

Featured Image 1
Electrical Services

Associations & Memberships

CCR (Central Contractor Registration)
CCR (Central Contractor Registration)

Preferred Brands

Leviton
Leviton
Southwire
Southwire
Square D
Square D
GE Lighting
GE Lighting
Share URL copied!
https://www.thebluebook.com/iProView/794064/current-electrical-contractors/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.