Masone & Sons Contracting

Columbia, MD 21044

4.9

Company Info

  • Est. 1999
  • Size 10-19 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

We are a  self perfomring General Contractor workin on Kent Island, Anne Arundle Coutny, Queen Anne's County and Talbot County Maryland.  We work on jobs ranging from $,5000 in services to $100000 additions and renovations. Masone & Sons Contracting has been in business since 1999.

We are located in the Kent Island Maryland area.

What We Do

Commercial Experience

Apartments & Condominiums Arena / Stadium Assisted Living Auto Dealership / Service Casinos Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Education (K-12) Hotel / Motel Misc Project Non-Building Construction Parking Garage Restaurant School / College / University
Golf Course Government Grocery Stores Historic Preservation Hospital / Nursing Home Marine Medical Office Military Park / Playground Parking Lots Post Office Road / Highway Storage Facility / Warehouse Tennis Court Terminal - Airport / Bus / Railroad Theater Theme Park

Regions & Counties Serviced

  • Washington D.C.

Delaware All

District Of Columbia All

Florida 3

  • De Soto
  • Franklin
  • Gadsden

Maryland All

Pennsylvania All

Virginia 7

  • Alexandria (City Of)
  • Arlington
  • Fairfax (City Of)
  • Fauquier
  • Loudoun
  • Manassas (City Of)
  • Winchester (City Of)

West Virginia 5

  • Berkeley
  • Jefferson
  • Monongalia
  • Morgan
  • Preston

Our CSI Codes

01 33 16 - Design Data
01 33 29 - Sustainable Design Reporting
01 35 16 - Alteration Project Procedures
01 73 23 - Bracing and Anchoring
01 78 43 - Spare Parts
01 78 53 - Sustainable Design Closeout Documentation
01 81 13 - Sustainable Design Requirements
01 87 16 - Furnishings Performance Requirements
01 90 00.00.01 - Life Cycle Activities
01 94 13 - Facility Decommissioning Procedures
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
04 01 20 - Maintenance of Unit Masonry
04 01 20.51 - Unit Masonry Maintenance
04 01 60 - Maintenance of Corrosion-Resistant Masonry
04 01 70 - Maintenance of Manufactured Masonry
04 05 16 - Masonry Grouting
04 06 20 - Schedules for Unit Masonry
04 06 20.13 - Masonry Unit Schedule
04 06 60 - Schedules for Corrosion-Resistant Masonry
04 57 00.00.01 - Masonry Fireplaces
06 01 10 - Maintenance of Rough Carpentry
06 01 10.71 - Rough Carpentry Rehabilitation
06 01 10.91 - Rough Carpentry Restoration
06 01 10.92 - Rough Carpentry Preservation
06 06 10 - Schedules for Rough Carpentry
06 06 10.13 - Nailing Schedule
06 06 10.19 - Plywood Shear Wall Schedule
06 10 53 - Miscellaneous Rough Carpentry
06 13 13 - Log Construction
06 13 13.91 - Period Horizontal Log Work
06 13 16 - Pole Construction
06 13 23 - Heavy Timber Construction
06 14 00.00.01 - Treated Wood Foundations
06 20 13 - Exterior Finish Carpentry
06 46 91 - Splicing of Wooden Components
07 01 10 - Maintenance of Dampproofing and Waterproofing
07 01 30 - Maintenance of Steep Slope Roofing
07 01 50 - Maintenance of Membrane Roofing
07 01 50.23 - Roof Removal
07 01 50.61 - Roof Re-Coating
07 01 50.81 - Roof Replacement
07 01 50.91 - Roofing Restoration
07 01 90 - Maintenance of Joint Protection
07 01 90.71 - Joint Sealant Rehabilitation
07 01 90.81 - Joint Sealant Replacement
07 06 10 - Schedules for Dampproofing and Waterproofing
07 06 30 - Schedules for Steep Slope Roofing
07 06 50 - Schedules for Membrane Roofing
07 06 80.13 - Fireproofing Schedule
07 06 90.13 - Joint Sealant Schedule
07 57 13 - Sprayed Polyurethane Foam Roofing
07 90 00.00.01 - Joint Protection
08 01 10 - Operation and Maintenance of Doors and Frames
08 01 41 - Operation and Maintenance of Entrances
08 01 80 - Maintenance of Glazing
08 01 81 - Maintenance of Glass Glazing
08 01 84 - Maintenance of Plastic Glazing
08 01 88 - Maintenance of Special Function Glazing
08 05 00.00.01 - Common Work Results for Openings
08 06 10 - Door Schedule
08 06 80 - Glazing Schedule
09 01 20 - Maintenance of Plaster and Gypsum Board
09 01 90 - Maintenance of Painting and Coating
09 01 90.51 - Paint Cleaning
09 01 90.52 - Maintenance Repainting
09 01 90.53 - Maintenance Coatings
09 01 90.61 - Repainting
09 01 90.91 - Paint Restoration
09 01 90.92 - Coating Restoration
09 01 90.93 - Paint Preservation
09 06 20 - Schedules for Plaster and Gypsum Board
09 06 90 - Schedules for Painting and Coating
09 06 90.13 - Paint Schedule
09 29 82 - Gypsum Board Fireproofing
09 91 13 - Exterior Painting
09 91 23 - Interior Painting
09 93 13.13 - Exterior Staining
09 93 13.53 - Exterior Finishing
09 93 23 - Interior Staining and Finishing
09 93 23.13 - Interior Staining
09 93 23.53 - Interior Finishing
09 94 16 - Faux Finishing
09 94 19 - Multicolor Interior Finishing
10 74 43 - Below-Grade Egress Assemblies
11 92 23 - Agricultural Waste Clean-Up Equipment
12 11 23 - Brick Murals
12 11 33 - Trompe l'oeil
22 01 10 - Operation and Maintenance of Plumbing Piping and Pumps
22 01 30 - Operation and Maintenance of Plumbing Equipment
22 01 40 - Operation and Maintenance of Plumbing Fixtures
22 06 10 - Schedules for Plumbing Piping and Pumps
22 06 10.13 - Plumbing Pump Schedule
22 06 30.13 - Domestic Water Heater Schedule
22 10 00.00.01 - Plumbing Piping and Pumps
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 13 19.13 - Sanitary Drains
22 14 13 - Facility Storm Drainage Piping
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 60.71 - Refrigerant Recovery/Recycling
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 22 13.13 - Underground Steam and Condensate Heating Piping
23 30 00.00.01 - HVAC Air Distribution
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 01 70.61 - Tunnel Leak Repairs
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.19 - Planting Soil Mixing
32 91 13.26 - Planting Beds
32 92 16 - Plugging
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 50 - Schedules for Fuel Distribution Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 39.23 - Underground High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 41 16 - Levee Cutoff Trenches
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 49 13.16 - Masonry Floodwalls
35 53 33 - Underwater Pipeline Construction
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 74 13 - Concrete Buttress Dams
40 23 36 - Sanitary Water Process Piping
40 95 73 - Process Control Wiring
41 67 23 - Plant Maintenance Tools
43 01 10 - Operation and Maintenance of Gas Handling Equipment
43 01 20 - Operation and Maintenance of Liquid Handling Equipment
GC 08 01 - Amusement Parks & Attractions
GC 11 01 - Aviation
GC 14 01 - Biosciences & Laboratories
GC 17 01 - Bridges
GC 19 01 - Casinos
GC 20 01 - Civil & Site Development
GC 22 01 - Convention Centers
GC 23 01 - Dams & Levies
GC 26 01 - Education (Higher)
GC 29 01 - Education (K-12)
GC 32 01 - Fire, Police & Emergency Service Stations
GC 35 01 - Fueling Stations
GC 38 01 - Golf Courses
GC 41 01 - Healthcare
GC 42 01 - Historic Preservation
GC 44 01 - Hotels & Hospitality
GC 47 01 - Industrial Warehousing & Distribution Centers
GC 49 01 - Libraries
GC 50 01 - Luxury Custom Residential
GC 53 01 - Manufacturing Plants
GC 54 01 - Mixed Use
GC 56 01 - Multi-Family Residential
GC 59 01 - Municipal & Government
GC 60 01 - Museums
GC 62 01 - Office & General Commerical
GC 63 01 - Parking Structures
GC 64 01 - Parks and Recreation Facilities
GC 65 01 - Ports & Marinas
GC 68 01 - Power Generation & Distribution
GC 71 01 - Pre-Manufactured Structures
GC 72 01 - Prisons & Correctional Facilities
GC 74 01 - Railways & Related Structures
GC 77 01 - Religious & Community Facilities
GC 80 01 - Restaurants
GC 83 01 - Retail
GC 85 01 - Roads & Highways
GC 86 01 - Secure and Shielded Facilities
GC 87 01 - Stadiums & Sports Arenas
GC 88 01 - Tenant Improvements
GC 89 01 - Underground Utilities
GC 92 01 - Wastewater & Sewage Treatment

Project Experience

  • Non-Union
  • Public
  • Private
  • Service Work/Repairs
  • Projects Up to $30,000

Gallery

Featured Image 1
Shelly Blue Book office manufacturing Photo 1
Featured Image 2
Shore Birds Stadium electrical Salisbury, MD Photo 1
Featured Image 3
Shelly's Restaurant - Carpets and Flooring Photo 1
Featured Image 4
Alexandria Shelly's Garage- electric car charging stations

Associations & Memberships

Associated Builders and Contractors
Associated Builders and Contractors
Maryland Construction Network
Maryland Construction Network

Preferred Brands

Trane
Trane
Anderson Door Co.
Anderson Door Co.
KHK
KHK
Armstrong
Armstrong
USG (United States Gypsum)
USG (United States Gypsum)
GE
GE
General Air Products
General Air Products
AO Safety
AO Safety
Sherwin-Williams
Sherwin-Williams
Haworth
Haworth
Blueline Technologies
Blueline Technologies
Key Resin
Key Resin
Armstrong Air
Armstrong Air
Armstrong Audio
Armstrong Audio
Armstrong Industrial Hand Tools
Armstrong Industrial Hand Tools
Carrier
Carrier
Toto
Toto
Leviton
Leviton
Pass & Seymour
Pass & Seymour
Mohawk ArmorMax
Mohawk ArmorMax
Level Master Elite
Level Master Elite
Mohawk Cable
Mohawk Cable
Mohawk Ceramic Tile
Mohawk Ceramic Tile
Trane Comfort Specialist
Trane Comfort Specialist
Sherwin-Williams - Ceramic Carpet 400
Sherwin-Williams - Ceramic Carpet 400
Sherwin-Williams Protective & Marine Coatings
Sherwin-Williams Protective & Marine Coatings
L & L Louvers
L & L Louvers
M & W Manufacturing
M & W Manufacturing
Siemens
Siemens
Dryvit
Dryvit
Kohler Power Systems
Kohler Power Systems
Kitchen Kompact
Kitchen Kompact
Bil-Jax Scaffolding
Bil-Jax Scaffolding
Bosch Power Tools
Bosch Power Tools
Share URL copied!
https://www.thebluebook.com/iProView/793385/masone-sons-contracting/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.