Logo

PLI Systems

Share

Hillsboro, OR 97123

Company Info

  • Est. 2003
  • Size 20-49 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

PLI Systems, Inc. is dedicated to providing the most innovative solutions for challenging soil and foundation issues. With nearly 30 years of experience, PLI Systems has the expertise and equipment to handle almost any soil and foundation stabilization problem. We have gathered specialized equipment from all over the world and have hired experts from various fields to train our employees. From temporary or permanent shoring to drilled and grouted tie-back anchors to dewatering,

What We Do

Commercial Experience

Misc Project
Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Non-Building Construction Non-Residential Building Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Residential Building Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tract Housing Tunnel Utilities

Regions & Counties Serviced

  • Portland

Oregon All

Washington All

Our CSI Codes

01 73 23 - Bracing and Anchoring
02 25 16.13 - Concrete Assessment Drilling
02 32 13 - Subsurface Drilling and Sampling
03 01 70 - Maintenance of Mass Concrete
03 06 70 - Schedules for Mass Concrete
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
31 01 40 - Maintenance of Shoring and Underpinning
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 06 40 - Schedules for Shoring and Underpinning
31 06 60.13 - Driven Pile Schedule
31 09 16.23 - Driven Pile Load Tests
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 40 00.00.01 - Shoring and Underpinning
31 48 13 - Underpinning Piers
31 48 33 - Micropile Underpinning
31 53 13 - Timber Cribwork
31 62 13.13 - Cast-in-Place Concrete Piles
31 63 16 - Auger Cast Grout Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 63 33 - Drilled Micropiles
31 72 13 - Rock Reinforcement and Initial Support
32 06 30.13 - Retaining Wall Schedule
32 11 33 - Cement-Treated Base Courses
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 34 - Reinforced Soil Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
35 31 16.16 - Segmental Seawalls
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 35 - Slope Protection Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Projects From $100,000 to $2,000,000

Gallery

Featured Image 1
Recent Projects
Featured Image 2
Recent Projects
Featured Image 3
Recent Projects
Featured Image 4
Recent Projects
Service Area and Locations Map for PLI Systems

Associations & Memberships

ACI (Allied Construction Industries)
ACI (Allied Construction Industries)
AGC (Associated General Contractors)
AGC (Associated General Contractors)
Share URL copied!
https://www.thebluebook.com/iProView/556311/pli-systems/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.