Logo

Limeco, Inc.

Pearland, TX 77588

People Also View These
Loading...

Our Story

Limeco, Inc. is a family owned and operated business serving the Houston area since 1977. George and Bonnie Clark, and their three sons, Steven, Scott, and Bobby, have established a reputation for Limeco’s high quality and dependable products and service. The company is located in Pearland, TX.

What We Do

Commercial Experience

Airport Runway Animal Hospital / Kennel Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tract Housing Tunnel Utilities

Regions & Counties Serviced

  • Houston

Texas 18

  • Brazoria
  • Brazos
  • Chambers
  • Fort Bend
  • Galveston
  • Grimes
  • Hardin
  • Harris
  • Jefferson
  • Liberty
  • Matagorda
  • Montgomery
  • Orange
  • San Jacinto
  • Walker
  • Waller
  • Washington
  • Wharton

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 30 00.00.01 - Earthwork Methods
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 72 13 - Rock Reinforcement and Initial Support
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 11 33 - Cement-Treated Base Courses
32 30 00.00.01 - Site Improvements
32 32 34 - Reinforced Soil Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 41 16 - Levee Cutoff Trenches
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection
35 73 13 - Earth Embankment Dam

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Projects From $100,000 to $500,000

Gallery

Featured Image 1
What is a Pozzolan Material?

Associations & Memberships

APA (American Planning Assn.)
APA (American Planning Assn.)
HCA (Houston Contractors Assn.)
HCA (Houston Contractors Assn.)
Pearland Chamber of Commerce
Pearland Chamber of Commerce
NSF 2013
TMT Factory Trained Technician
TMT Factory Trained Technician
Share URL copied!
https://www.thebluebook.com/iProView/417131/limeco-inc/material-suppliers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.