Logo

Rieth-Riley Construction Co., Inc.

Share

Gary, IN 46406

Company Info

  • Est. 1916
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Rieth-Riley gets the job done on time, on spec and on budget.

From adhering to project specifications to communicating openly with customers, we strive to exceed customer expectations.  Not only is it done right , integrity drives everything we do.  Our employees are our greatest asset and what make us the industry leader.

Every Rieth-Riley employee knows the importance of quality performance and quality control.  Our in-house, certified technicians continually monitor the output of our asphalt and concrete plants to make sure we measure up to your special project requirements.

Only top quality materials are used to provide the long-term performance and durability our customers demand.

Not only do we take pride in our work,  we also take pride in our community.  We donate to a number of employee/owner chosen charities and participate in community events each year.

We are a 100% employee owned company.  This results in ownership pride in our work.  So if you want dependable and honest customer service, call on us at Rieth-Riley.

What We Do

Commercial Experience

Misc Project
Airport Runway Animal Hospital / Kennel Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Mixed Use Museum Non-Building Construction Non-Residential Building Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Tunnel Utilities

Regions & Counties Serviced

  • Chicago, N.W. Indiana

Illinois 3

  • Cook
  • Dupage
  • Will

Indiana All

Michigan All

Our CSI Codes

01 53 26 - Temporary Runarounds
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
03 37 23 - Roller-Compacted Concrete
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 16.13 - Roadway Subgrade Reshaping
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 01 13 - Operation and Maintenance of Roadways
34 01 33 - Operation and Maintenance of Airfields
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 33 - Common Work Results for Airports
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 33 - Schedules for Airfields
34 06 43 - Schedules for Bridges
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam

Project Experience

  • Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Projects From $10,000 to $20

Gallery

Featured Image 1
Asphalt Paving
Featured Image 2
Asphalt Supply
Featured Image 3
Concrete Construction
Featured Image 4
Parking Lot Paving
Service Area and Locations Map for Rieth-Riley Construction Co., Inc.

Associations & Memberships

NAPA (National Asphalt Pavement Assn.)
NAPA (National Asphalt Pavement Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/417072/rieth-riley-construction-co-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.