Logo

A O Construction Inc.

Attleboro, MA 02703

Company Info

  • Est. 1995
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

With more than 300 tons of equipment available, A O Construction specializes in residential and commercial work such as demolition, road construction, foundations, septic installations, and grading.

Our crew chief and staff of operators are trained to run our equipment with speed and safety in mind. We will complete your work in a timely and professional manner.

What We Do

Commercial Experience

Regions & Counties Serviced

  • New England

Massachusetts 6

  • Barnstable
  • Bristol
  • Dukes
  • Nantucket
  • Norfolk
  • Plymouth

Rhode Island All

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 14 13 - Facility Storm Drainage Piping
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
31 53 13 - Timber Cribwork
32 01 30 - Operation and Maintenance of Site Improvements
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 30 - Schedules for Site Improvements
32 06 30.13 - Retaining Wall Schedule
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 30 00.00.01 - Site Improvements
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.19 - Planting Soil Mixing
32 91 13.26 - Planting Beds
32 92 16 - Plugging
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 31 16.16 - Segmental Seawalls
35 41 16 - Levee Cutoff Trenches
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 73 13 - Earth Embankment Dam

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects From $10,000 to $500,000

Gallery

Featured Image 1
Komatsu PC 400 LC 3 (with hammer)
Featured Image 2
Randolph Fire Station
Featured Image 3
Attleboro Enterprises - Complete Sitework
Featured Image 4
Five Guys

Preferred Brands

AdvanTex Treatment Systems
AdvanTex Treatment Systems
CULTEC Stormwater & Septic Solutions
CULTEC Stormwater & Septic Solutions
Eljen Environmental Products
Eljen Environmental Products
Infiltrator Systems Inc.
Infiltrator Systems Inc.
Share URL copied!
https://www.thebluebook.com/iProView/412336/a-o-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.