Logo

Robert B. Our Co., Inc.

Harwich, MA 02645

Company Info

  • Est. 1957
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

We’re behind many of the best businesses. Or, more specifically, underneath them.

90% of our work you can’t see when the project is finished — but all of it is critical to a successful project. Whether the finished project is a big box store, shopping plaza, or parking lot, Robert B. Our Co. starts the job with site preparation, foundation excavation, and installation of water, sewer, and drainage. Just as important, we ensure a seamless handoff to your other contractors.

What We Do

Commercial Experience

Airport Runway Athletic Field Civil & Site Development Dams & Levies Marine Non-Building Construction Park / Playground Parking Lots Pre-Manufactured Structures Road / Highway Sewage / Water Treatment Plant Tunnel Utilities

Regions & Counties Serviced

  • New England

Massachusetts 10

  • Barnstable
  • Bristol
  • Dukes
  • Essex
  • Middlesex
  • Nantucket
  • Norfolk
  • Plymouth
  • Suffolk
  • Worcester

Our CSI Codes

01 53 26 - Temporary Runarounds
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 54 13 - Aerobic Processes Decontamination
02 54 16 - Anaerobic Processes Decontamination
02 58 16 - Snow Avalanche Control
03 37 23 - Roller-Compacted Concrete
06 13 33 - Heavy Timber Pier Construction
13 34 19 - Metal Building Systems
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 13 23 - Sanitary Waste Interceptors
22 13 26 - Sanitary Waste Separators
22 13 29.33 - Sewerage Pump Basins and Pits
22 13 36 - Packaged, Wastewater Pump Units
22 13 43 - Facility Packaged Sewage Pumping Stations
22 13 43.13 - Facility Dry-Well Packaged Sewage Pumping Stations
22 13 43.16 - Facility Wet-Well Packaged Sewage Pumping Stations
22 13 53 - Facility Septic Tanks
22 14 13 - Facility Storm Drainage Piping
22 14 29.19 - Sump-Pump Basins and Pits
22 31 13 - Residential Domestic Water Softeners
22 31 16 - Commercial Domestic Water Softeners
22 32 13 - Domestic-Water Bag-Type Filters
22 32 16 - Domestic-Water Freestanding Cartridge Filters
22 32 19 - Domestic-Water Off-Floor Cartridge Filters
22 32 23 - Domestic-Water Carbon Filters
22 32 26 - Domestic-Water Sand Filters
22 32 26.13 - Domestic-Water Circulating Sand Filters
22 32 26.16 - Domestic-Water Multimedia Sand Filters
22 67 13.16 - Reverse-Osmosis Water Piping
22 67 13.19 - Deionized-Water Piping
22 67 19 - Processed Water Equipment for Laboratory and Healthcare Facilities
22 67 19.13 - Distilled-Water Equipment
22 67 19.16 - Reverse-Osmosis Water Equipment
22 67 19.19 - Deionized-Water Equipment
23 22 13.13 - Underground Steam and Condensate Heating Piping
23 25 13 - Water Treatment for Closed-Loop Hydronic Systems
23 25 16 - Water Treatment for Open Hydronic Systems
23 25 19 - Water Treatment for Steam System Feedwater
23 25 23 - Water Treatment for Humidification Steam System Feedwater
23 51 43.16 - Particulate Filtration
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 06 60.13 - Driven Pile Schedule
31 09 16.23 - Driven Pile Load Tests
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 16.13 - Roadway Subgrade Reshaping
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
31 62 13.13 - Cast-in-Place Concrete Piles
31 63 16 - Auger Cast Grout Piles
31 63 19.13 - Rock Sockets for Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 12 23 - Water Utility Pumping Stations
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 32 13 - Packaged Utility Lift Stations
33 32 13.13 - Packaged Sewage Lift Stations, Wet Well Type
33 32 16 - Packaged Utility Wastewater Pumping Stations
33 32 16.13 - Packaged Sewage Grinder Pumping Units
33 32 19 - Public Utility Wastewater Pumping Stations
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 36 13 - Utility Septic Tank and Effluent Wet Wells
33 36 16 - Utility Septic Tank Effluent Pumps
33 36 33 - Utility Drainage Field
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 13 - Operation and Maintenance of Roadways
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 43 - Schedules for Bridges
34 73 23 - Manufactured Airfield Control Towers
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 41 16 - Levee Cutoff Trenches
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 37 - Riprap Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 13 - Earth Embankment Dam
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
40 23 36 - Sanitary Water Process Piping
41 14 16 - Batch Cars/Transports
41 14 19 - Batch Hoppers
43 32 56 - Reverse-Osmosis Purification Units
43 32 66 - Vacuum Degasifiers
43 32 69 - Chemical Feed Systems
43 32 76 - Chlorination Equipment
44 06 40 - Schedules for Water Treatment Equipment
44 40 00.00.01 - Water Treatment Equipment
44 41 13 - Packaged Water Treatment Plants
44 41 13.13 - Chemical Packaged Water Treatment Plants
44 41 13.16 - Biological Packaged Water Treatment Plants
44 41 13.19 - Thermal Packaged Water Treatment Plants
44 42 26 - Water Treatment Comminutors
44 42 59 - Water Treatment Reactors
44 43 13 - Water Filters
44 44 13 - Water Treatment Chemical Feed Equipment
44 44 19 - Water Coagulators
44 44 23 - Water Dechlorinators
44 44 29 - Water Emulsifiers
44 44 33 - Water Emulsion Crackers
44 44 36 - Water Flocculators
44 44 39 - Water Fluoridation Equipment
44 44 46 - Water Hydrothermal Equipment
44 44 49 - Water Oils Treatment Equipment
44 44 53 - Water Oxidation/Reduction Equipment
44 44 56 - Water Ozone Equipment
44 44 69 - Water Pretreatment Equipment
44 45 13 - Water Biofilters
44 46 26 - Sludge Thickeners

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • Projects Up to $15,000,000

Gallery

Featured Image 1
Commercial Site Development
Featured Image 2
On The Job
Featured Image 3
Services
Featured Image 4
Marine Construction

Associations & Memberships

UCANE (Utility Contractors Assn. of New England)
UCANE (Utility Contractors Assn. of New England)
CIM (Construction Industries of Massachusetts)
CIM (Construction Industries of Massachusetts)
Share URL copied!
https://www.thebluebook.com/iProView/411969/robert-b-our-co-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.