Garney Construction
Kansas City, MO 64118-4554
Featured Project Return to Projects List
Winkler Services Water Transmission Infrastructure
Project Information
- Project Location:
- Kermit, TX
- Status:
- Completed
- Structure Type:
- Sewage / Water Treatment Plant
Scope Of Work
This project for Winkler Midstream LLC included the construction of a raw water pump station with two 500 hp pumps and a rated capacity of 10.5 MGD, and 62,970 LF of 24″ and 32,675 LF of 20″ PVC waterlines. The project required a 160 LF 30″ auger bore, 530 LF 24″ directional drill, 18 EA 48″ manholes, rock excavation via trenching, and an outlet discharge structure.