Logo

Costello Brothers Marine Construction, Inc.

Sebring, FL 33871

Company Info

  • Est. 1999
  • Size 10-19 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Costello Brothers Marine Construction are experts in marine construction. We offer high quality solutions at cost effective prices.Costello Brothers is a licensed Marine Construction Contractor and a member of the Better Business Bureau. We provide FREE Estimates and Permit Consulting. CBMC provides solutions to your heavy marine construction projects from bridges, docks and marinas to water control and stormwater drainage improvements. We build quality structures for both in and out of the water.

What We Do

Commercial Experience

Marine
Airport Runway Animal Hospital / Kennel Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Golf Course Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Medical Office Mixed Use Museum Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Terminal - Airport / Bus / Railroad Theater

Regions & Counties Serviced

  • Florida-South-West Palm Beach, Miami, Naples

Florida All

Our CSI Codes

01 35 16 - Alteration Project Procedures
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
06 13 33 - Heavy Timber Pier Construction
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 06 60.13 - Driven Pile Schedule
31 09 16.23 - Driven Pile Load Tests
31 53 13 - Timber Cribwork
31 62 13.13 - Cast-in-Place Concrete Piles
31 63 16 - Auger Cast Grout Piles
31 63 19.13 - Rock Sockets for Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 06 30.13 - Retaining Wall Schedule
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.16 - Segmental Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 37 - Riprap Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • Projects From $50,000 to $5,000,000

Gallery

Featured Image 1
Lakeland Stormwater - Before
Featured Image 2
Lakeland Stormwater - After
Featured Image 3
Lowes - Before
Featured Image 4
Lowes - After

Preferred Brands

EverGrain Composite Decking
EverGrain Composite Decking
Gator Dock Marine Access Solutions
Gator Dock Marine Access Solutions
Share URL copied!
https://www.thebluebook.com/iProView/396797/costello-brothers-marine-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.