Logo

Pacific Coast General Engineering

Pittsburg, CA 94565

Company Info

  • Est. 2007
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Pacific Coast General Engineering, Inc. takes pride in being competitive and efficient in the world of engineering and construction management. Our goal is to provide an honest and competent general engineering firm where integrity is never compromised and good old fashion values of honesty and hard work are more then just words.

What We Do

Commercial Experience

Misc Project Parking Lots
Arena / Stadium Athletic Field Laboratory Utilities

Regions & Counties Serviced

  • San Francisco, Oakland, San Jose

California 31

  • Alameda
  • Amador
  • Butte
  • Calaveras
  • Contra Costa
  • El Dorado
  • Fresno
  • Kern
  • Kings
  • Madera
  • Marin
  • Mariposa
  • Merced
  • Napa
  • Plumas
  • Sacramento
  • San Francisco
  • San Joaquin
  • San Mateo
  • Santa Clara
  • Santa Cruz
  • Shasta
  • Solano
  • Sonoma
  • Stanislaus
  • Sutter
  • Tehama
  • Tulare
  • Tuolumne
  • Yolo
  • Yuba

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 32 19 - Exploratory Excavations
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 58 16 - Snow Avalanche Control
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
03 11 13.13 - Concrete Slip Forming
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
11 92 23 - Agricultural Waste Clean-Up Equipment
23 01 60.71 - Refrigerant Recovery/Recycling
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Union
  • Public
  • Private
  • Projects From $20,000 to $3,000,000

Gallery

Featured Image 1
Amphitheater Construction
Featured Image 2
Livermore Laboratories
Featured Image 3
Bosque Landscaping
Featured Image 4
Livermore Laboratories

Associations & Memberships

BBB (Better Business Bureau)
BBB (Better Business Bureau)
EUCA (Engineering & Utility Contractors Assn.)
EUCA (Engineering & Utility Contractors Assn.)
CCBX (Contra Costa Builders Exchange)
CCBX (Contra Costa Builders Exchange)
LiUNA (Laborers International Union of North America) Local 172
LiUNA (Laborers International Union of North America) Local 172
OSHA (Occupational Safety & Health Administration)
OSHA (Occupational Safety & Health Administration)
Share URL copied!
https://www.thebluebook.com/iProView/395145/pacific-coast-general-engineering/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.