Logo

Sherry Construction Corp.

Swansea, MA 02777

Company Info

  • Est. 1933
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

For over 75 years Sherry Construction Corp. has been paving South Eastern Massachusetts and Rhode Island’s roadways, parking lots, tennis courts, and driveways. We are a private, family owned corporation and are fully bonded, licensed, and insured. Our reputation for customer service and quality paving is unmatched in the industry. Contact Sherry Construction Corp. today for all your paving needs!

We are family owned and operated, and have been in the asphalt paving and construction business since 1933. Sherry Construction Corp. has the experience to get the job done professionally, on budget, and on time. Our paving and site work crews provide quality service to all of Rhode Island and Southeastern Massachusetts.

Sherry Construction Corp. Specializes in the following service areas:

  • Commercial & Residential Asphalt Paving
  • Asphalt Patches & Maintenance
  • Parking Lot Maintenance
  • Utility Excavation
  • Foundation Excavation
  • Retaining Walls
  • Septic System Installation
  • Sales of Bulk Landscaping and Construction Materials
  • Snow Removal Services

What We Do

Commercial Experience

Parking Lots Tennis Court
Apartments & Condominiums

Regions & Counties Serviced

  • New England

Massachusetts 6

  • Barnstable
  • Bristol
  • Dukes
  • Nantucket
  • Norfolk
  • Plymouth

Rhode Island All

Our CSI Codes

23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 10 00.00.01 - Bases, Ballasts, and Paving
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 11 16 - Subbase Courses
32 11 16.13 - Sand-Clay Subbase Courses
32 11 26 - Asphaltic Base Courses
32 11 26.13 - Plant Mix Asphaltic Base Courses
32 11 26.16 - Road Mix Asphaltic Base Courses
32 11 26.19 - Bituminous-Stabilized Base Courses
32 11 29 - Lime Treated Base Courses
32 11 29.13 - Lime-Fly Ash-Treated Base Courses
32 11 33.13 - Portland Cement-Stabilized Base Courses
32 11 36 - Concrete Base Courses
32 11 36.13 - Lean Concrete Base Courses
32 11 36.16 - Plain Cement Concrete Base Courses
32 11 36.19 - Hydraulic Cement Concrete Base Courses
32 12 13.13 - Tack Coats
32 12 13.16 - Asphaltic Tack Coats
32 12 13.23 - Asphaltic Prime Coats
32 12 16 - Asphalt Paving
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 12 19 - Asphalt Paving Wearing Courses
32 12 19.13 - Road-Mix Asphalt Paving Wearing Courses
32 12 19.16 - Resin-Modified Asphalt Paving Wearing Courses
32 12 19.19 - Porous Friction Asphalt Paving Wearing Courses
32 12 36.13 - Asphaltic Seal and Fog Coats
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 46 23 - Drainage Layers
33 46 23.16 - Gravel Drainage Layers
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 63 23 - Aboveground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 41 16 - Levee Cutoff Trenches
40 23 36 - Sanitary Water Process Piping
44 43 29 - Water Filtration Sand

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • Projects Up to $500,000

Gallery

Featured Image 1
Commercial Paving
Featured Image 2
Commercial Paving
Featured Image 3
Commercial Paving
Featured Image 4
Asphalt Paving

Associations & Memberships

RIBA (Rhode Island Builders Assn.)
RIBA (Rhode Island Builders Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/394832/sherry-construction-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.