Logo

Pace Material Handling, Inc.

Auburn, WA 98071

Company Info

  • Est. 1989
  • Size 10-19 Employees
  • DUNS # 090887092

Featured Project Return to Projects List

Priest Rapids Dam

Project Information

Project Location:
Columbia River, WA
Status:
Completed
Structure Type:
Bridge

Scope Of Work

This particular project proved to be challenging in its own right. The basic idea was to provide a lift inside the dam to service from the third floor, sitting at ground level, down to the two lower levels that reached the bottom of the Columbia River. This lift, when completed, will be used for moving parts, materials, and forklifts to the other floors for servicing the turbines. Our first task was to get our supplies down to the first floor where large turbines are, generating massive amounts of power from the Columbia River. We then built this lift up to the ground level floor.

Pace Material Handling provided design application assistance and complete installation of this Material Lift. Pace partnered with Pflow Industries, Inc. for the equipment.

Basic Specifications

Pflow Series F 4-post Material Lift

Carriage 10’ x 14’ with powered gates on carriage

54’ tall with 40’-6” travel to 3 floors, all with powered gates

20,000 lbs. lifting capacity

18 feet per minute travel speed

Project Images

#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/383688/pace-material-handling-inc/material-suppliers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.