Pace Material Handling, Inc.
Auburn, WA 98071
Featured Project Return to Projects List
Priest Rapids Dam
Project Information
- Project Location:
- Columbia River, WA
- Status:
- Completed
- Structure Type:
- Bridge
Scope Of Work
This particular project proved to be challenging in its own right. The basic idea was to provide a lift inside the dam to service from the third floor, sitting at ground level, down to the two lower levels that reached the bottom of the Columbia River. This lift, when completed, will be used for moving parts, materials, and forklifts to the other floors for servicing the turbines. Our first task was to get our supplies down to the first floor where large turbines are, generating massive amounts of power from the Columbia River. We then built this lift up to the ground level floor.
Pace Material Handling provided design application assistance and complete installation of this Material Lift. Pace partnered with Pflow Industries, Inc. for the equipment.
Basic Specifications
Pflow Series F 4-post Material Lift
Carriage 10’ x 14’ with powered gates on carriage
54’ tall with 40’-6” travel to 3 floors, all with powered gates
20,000 lbs. lifting capacity
18 feet per minute travel speed