Logo

SIERRA CONSTRUCTION

Share

Merced, CA 95348

Company Info

  • Est. 1991
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

We are a general engineering contractor with an additional concrete contracting license, as well as a landscaping contractors license serving both private and public sectors. In addition to our construction activities we are also a supplier of construction aggregates and sands as well as landscaping materials. We offer trucking, equipment hauling and low bedding services. 




 

 

 

What We Do

Commercial Experience

Misc Project
Airport Runway Apartments & Condominiums Arena / Stadium Athletic Field Civil & Site Development Design Build Golf Course Government Hotel / Motel Medical Office Military Mixed Use Non-Building Construction Non-Residential Building Park / Playground Parking Lots Power Generation & Distribution Pre-Manufactured Structures Renewable Energy Residential Building Retail Store Road / Highway Secure and Shielded Facilities Single Family Residential Storage Facility / Warehouse Terminal - Airport / Bus / Railroad Tract Housing Utilities

Regions & Counties Serviced

  • California-Central Valley-Sacramento, Fresno, Bakersfield

California 47

  • Alameda
  • Alpine
  • Amador
  • Butte
  • Calaveras
  • Colusa
  • Contra Costa
  • Del Norte
  • El Dorado
  • Fresno
  • Glenn
  • Humboldt
  • Kern
  • Kings
  • Lake
  • Lassen
  • Madera
  • Marin
  • Mariposa
  • Mendocino
  • Merced
  • Mono
  • Monterey
  • Napa
  • Nevada
  • Placer
  • Plumas
  • Sacramento
  • San Benito
  • San Francisco
  • San Joaquin
  • San Mateo
  • Santa Clara
  • Santa Cruz
  • Shasta
  • Sierra
  • Siskiyou
  • Solano
  • Sonoma
  • Stanislaus
  • Sutter
  • Tehama
  • Trinity
  • Tulare
  • Tuolumne
  • Yolo
  • Yuba

Our CSI Codes

01 73 29 - Cutting and Patching
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 25 19.13 - Masonry Assessment Drilling
02 32 19 - Exploratory Excavations
02 57 16 - Sinkhole Remediation by Backfilling
02 58 16 - Snow Avalanche Control
03 01 70 - Maintenance of Mass Concrete
03 01 80 - Maintenance of Concrete Cutting and Boring
03 06 70 - Schedules for Mass Concrete
03 06 80 - Schedules for Concrete Cutting and Boring
03 11 13.13 - Concrete Slip Forming
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
03 80 00.00.01 - Concrete Cutting and Boring
03 81 13 - Flat Concrete Sawing
03 81 16 - Track Mounted Concrete Wall Sawing
03 81 19 - Wire Concrete Wall Sawing
03 81 23 - Hand Concrete Wall Sawing
03 81 26 - Chain Concrete Wall Sawing
03 82 13 - Concrete Core Drilling
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 01 63 - Maintenance of Bored and Augered Piles
31 01 63.61 - Bored and Augered Pile Repairs
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
31 32 36 - Soil Nailing
31 32 36.13 - Driven Soil Nailing
31 32 36.19 - Corrosion-Protected Soil Nailing
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 13 - Cantilever Needle Beams
31 48 19 - Bracket Piers
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 54 00.00.01 - Ground Freezing
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
31 75 13 - Cast-in-Place Concrete Shaft Lining
32 01 30 - Operation and Maintenance of Site Improvements
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 30 - Schedules for Site Improvements
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.19 - Planting Soil Mixing
32 91 13.26 - Planting Beds
32 92 16 - Plugging
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs
  • Projects From $100,000 to $500,000

Diversity

  • Local Business Enterprise

Gallery

Featured Image 1
Commercial Landscape
Featured Image 2
Public Works
Service Area and Locations Map for SIERRA CONSTRUCTION

Associations & Memberships

California Assn. of Tree Trimmers and Landscapers
California Assn. of Tree Trimmers and Landscapers
California Approved Small Business
California Approved Small Business
California Landscape Contractors Assn.
California Landscape Contractors Assn.
SBE (Small Business Enterprise)
SBE (Small Business Enterprise)
Operating Engineers Local No. 3
Operating Engineers Local No. 3
Share URL copied!
https://www.thebluebook.com/iProView/377637/sierra-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.