Optimum Mechanical Systems, Inc.

Little Canada, MN 55117

Company Info

  • Est. 2005
  • Size 50-99 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Our combination of talent has over 80 years of experience in HVAC construction and service, and is able to handle your design, construction or service needs professionally and in a timely manner. Their collaboration in estimating, designing and constructing many different HVAC systems has resulted in a track history that includes many varied products, from tenant improvements to schools and from fast food to full service restaurants.

We chose the name of our company to indicate our product. Optimum Mechanical Systems is what we construct and service. We take great pride in our work, and with our extensive collaboration on each product, ensure that you are getting what you expect from your very own Optimum Mechanical System.

What We Do

Commercial Experience

Misc Project
Apartments & Condominiums Bank Church / Synagogue City / Town Hall Club House / Community Center Education (K-12) Fire / Police Station Fitness Center Library Manufacturing Plant Mixed Use Museum Non-Residential Building Restaurant Retail Store School / College / University Secure and Shielded Facilities Storage Facility / Warehouse

Regions & Counties Serviced

  • Minnesota - Minneapolis / St. Paul

Iowa All

Minnesota All

North Dakota All

Wisconsin All

Our CSI Codes

22 01 60 - Operation and Maintenance of Laboratory and Healthcare Systems
22 06 60 - Schedules for Laboratory and Healthcare Systems
22 11 13 - Facility Water Distribution Piping
22 15 13 - General Service Compressed-Air Piping
22 60 00.00.01 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 61 13 - Compressed-Air Piping for Laboratory and Healthcare Facilities
22 61 13.53 - Laboratory Compressed-Air Piping
22 61 13.70 - Healthcare Compressed-Air Piping
22 61 13.74 - Dental Compressed-Air Piping
22 61 19.70 - Healthcare Compressed-Air Equipment
22 62 13 - Vacuum Piping for Laboratory and Healthcare Facilities
22 62 13.53 - Laboratory Vacuum Piping
22 62 13.70 - Healthcare, Surgical Vacuum Piping
22 62 13.74 - Dental Vacuum Piping
22 62 23 - Waste Anesthesia-Gas Piping
22 63 13 - Gas Piping for Laboratory and Healthcare Facilities
22 63 13.53 - Laboratory Gas Piping
22 63 13.70 - Healthcare Gas Piping
22 66 53 - Laboratory Chemical-Waste and Vent Piping
22 66 70 - Healthcare Chemical-Waste and Vent Piping
22 66 83 - Chemical-Waste Tanks
22 67 13 - Processed Water Piping for Laboratory and Healthcare Facilities
22 67 13.13 - Distilled-Water Piping
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 05 13 - Common Motor Requirements for HVAC Equipment
23 06 10 - Schedules for Facility Fuel Service Systems
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.13 - HVAC Fan Schedule
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 50.13 - Heating Boiler Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 10 00.00.01 - Facility Fuel Systems
23 11 13 - Facility Fuel-Oil Piping
23 11 23 - Facility Natural-Gas Piping
23 20 00.00.01 - HVAC Piping and Pumps
23 21 13.23 - Aboveground Hydronic Piping
23 22 13 - Steam and Condensate Heating Piping
23 22 13.23 - Aboveground Steam and Condensate Heating Piping
23 24 16 - Internal-Combustion Engine Exhaust Piping
23 30 00.00.01 - HVAC Air Distribution
23 31 13.16 - Round and Flat-Oval Spiral Ducts
23 31 16.13 - Fibrous-Glass Ducts
23 31 16.16 - Thermoset Fiberglass-Reinforced Plastic Ducts
23 32 13 - Fabricated, Metal Air Plenums
23 32 36 - Air-Distribution Floor Plenums
23 32 39 - Air-Distribution Wall Plenums
23 32 43 - Air-Distribution Chases Formed by General Construction
23 34 13 - Axial HVAC Fans
23 34 16 - Centrifugal HVAC Fans
23 34 23 - HVAC Power Ventilators
23 35 16 - Engine Exhaust Systems
23 35 16.13 - Positive-Pressure Engine Exhaust Systems
23 35 16.16 - Mechanical Engine Exhaust Systems
23 36 13 - Constant-Air-Volume Units
23 36 16 - Variable-Air-Volume Units
23 37 16 - Fabric Air Distribution Devices
23 38 13 - Commercial-Kitchen Hoods
23 38 13.13 - Listed Commercial-Kitchen Hoods
23 38 13.16 - Standard Commercial-Kitchen Hoods
23 38 16 - Fume Hoods
23 41 43 - Ultra-Low Penetration Filtration
23 41 46 - Super Ultra-Low Penetration Filtration
23 43 13 - Washable Electronic Air Cleaners
23 43 16 - Agglomerator Electronic Air Cleaners
23 43 23 - Self-Contained Electronic Air Cleaners
23 51 13.13 - Draft-Induction Fans
23 51 43 - Flue-Gas Filtration Equipment
23 51 43.13 - Gaseous Filtration
23 57 19 - Liquid-to-Liquid Heat Exchangers
23 57 19.13 - Plate-Type, Liquid-to-Liquid Heat Exchangers
23 57 19.16 - Shell-Type, Liquid-to-Liquid Heat Exchangers
23 64 26 - Rotary-Screw Water Chillers
23 70 00.00.01 - Central HVAC Equipment
23 72 13 - Heat-Wheel Air-to-Air Energy-Recovery Equipment
23 72 16 - Heat-Pipe Air-to-Air Energy-Recovery Equipment
23 72 19 - Fixed-Plate Air-to-Air Energy-Recovery Equipment
23 72 23 - Packaged Air-to-Air Energy-Recovery Units
23 73 13 - Modular Indoor Central-Station Air-Handling Units
23 73 23 - Custom Indoor Central-Station Air-Handling Units
23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units
23 74 23.13 - Packaged, Direct-Fired, Outdoor, Heating-Only Makeup-Air Units
23 74 23.16 - Packaged, Indirect-Fired, Outdoor, Heating-Only Makeup-Air Units
23 74 33 - Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners
23 75 13 - Custom-Packaged, Outdoor, Central-Station Air-Handling Units
23 75 23 - Custom-Packaged, Outdoor, Heating and Ventilating Makeup-Air Units
23 75 33 - Custom-Packaged, Outdoor, Heating and Cooling Makeup Air-Conditioners
23 80 00.00.01 - Decentralized HVAC Equipment
23 81 13 - Packaged Terminal Air-Conditioners
23 81 16 - Room Air-Conditioners
23 81 19 - Self-Contained Air-Conditioners
23 81 19.13 - Small-Capacity Self-Contained Air-Conditioners
23 81 19.16 - Large-Capacity Self-Contained Air-Conditioners
23 81 23 - Computer-Room Air-Conditioners
23 81 26 - Split-System Air-Conditioners
23 82 13 - Valance Heating and Cooling Units
23 82 16 - Air Coils
23 82 19 - Fan Coil Units
33 81 33 - Communications Blowers, Fans, and Ventilation
40 01 10 - Operation and Maintenance of Gas and Vapor Process Piping
40 01 20 - Operation and Maintenance of Liquids Process Piping
40 01 40 - Operation and Maintenance of Process Piping and Equipment Protection
40 05 13 - Common Work Results for Process Piping
40 05 13.13 - Steel Process Piping
40 05 13.16 - Lined or Internally-Coated Steel Process Piping
40 05 13.19 - Stainless-Steel Process Piping
40 05 13.23 - Aluminum Alloys Process Piping
40 05 13.33 - Brass, Bronze, Copper, and Copper Alloys Process Piping
40 05 13.43 - Nickel and Nickel Alloys Process Piping
40 05 13.53 - Ductile, Malleable, and Cast Iron Alloys Process Piping
40 05 13.63 - Titanium and Titanium Alloys Process Piping
40 05 13.73 - Plastic Process Piping
40 05 13.76 - Fiberglass-Reinforced Plastic and Resins Process Piping
40 05 13.93 - Other Metals Process Piping
40 06 10 - Schedules for Gas and Vapor Process Piping
40 06 20 - Schedules for Liquids Process Piping
40 06 30 - Schedules for Solid and Mixed Materials Piping and Chutes
40 06 40 - Schedules for Process Piping and Equipment Protection
40 10 00.00.01 - Gas and Vapor Process Piping
40 11 13 - Low-Pressure Steam Process Piping
40 11 16 - Intermediate-Pressure Steam Process Piping
40 11 19 - High-Pressure Steam Process Piping
40 11 23 - Condensate Process Piping
40 12 13 - Breathing Compressed Air Process Piping
40 12 16 - Non-Breathing Compressed Air Process Piping
40 13 13 - Argon Process Piping
40 13 16 - Carbon-Dioxide Process Piping
40 13 19 - Helium Process Piping
40 13 23 - Krypton Process Piping
40 13 26 - Neon Process Piping
40 13 29 - Nitrogen Process Piping
40 13 33 - Xenon Process Piping
40 13 93 - Mixed Inert Gases Process Piping
40 14 16 - Blue (Water) Fuel Gas Piping
40 14 19 - Butane Piping
40 14 23 - Carbon-Monoxide Piping
40 14 26 - Chlorine Fuel Gas Piping
40 14 33 - Ethane-Gas Piping
40 14 36 - Hydrogen Fuel Gas Piping
40 14 39 - Liquid Natural-Gas Process Piping
40 14 43 - Methylacetylene-Propadiene Fuel Gas Piping
40 14 49 - Natural-Gas Process Piping
40 14 49.13 - Synthetic Natural-Gas Piping
40 14 49.23 - Propane-Air Mixes Fuel Gas Piping
40 14 53 - Octane Fuel Gas Piping
40 14 59 - Propane Fuel Gas Process Piping
40 14 63 - Sewage Fuel Gas Piping
40 14 93 - Mixed Fuel Gases Piping
40 15 13 - Combustion Air Piping
40 15 16 - Oxygen Combustion System Gas Piping
40 15 23 - Exothermic-Gas Combustion System Piping
40 15 26 - Endothermic-Gas Combustion System Piping
40 15 29 - Disassociated-Ammonia-Gas Combustion System Piping
40 16 13 - Ammonia Gas Piping
40 16 16 - Boron Gas Piping
40 16 26 - Diborane Gas Piping
40 16 29 - Fluorine Gas Piping
40 16 33 - Hydrogen Sulfide Gas Piping
40 16 36 - Nitrous-Oxide Gas Process Piping
40 16 39 - Ozone Gas Piping
40 16 43 - Phosphine Gas Piping
40 16 46 - Silane Gas Piping
40 16 49 - Sulfur-Dioxide Gas Piping
40 16 53 - Specialty Gas Mixtures Piping
40 18 13 - Low-Vacuum Systems Process Piping
40 18 16 - High-Vacuum Systems Process Piping
40 20 00.00.01 - Liquids Process Piping
40 21 13 - Bio Fuels Process Piping
40 22 16 - Light-Fractions Petroleum Products Piping
40 23 13 - De-Ionized Water Process Piping
40 23 16 - Distilled-Water Process Piping
40 23 19 - Process Plant Water Piping
40 23 23 - Potable Water Process Piping
40 23 29 - Recirculated Water Process Piping
40 23 33 - Reverse-Osmosis Water Process Piping
40 24 13 - Alcohol Piping
40 24 16 - Gel Piping
40 24 19 - Slurries Process Piping
40 24 23 - Thixotropic Liquid Piping
40 25 13 - Liquid Acids Piping
40 25 16 - Liquid Bases Piping
40 26 00.00.01 - Liquid Polymer Piping
43 11 13 - Gas Handling Fans
43 11 13.13 - Axial Gas Handling Fans
43 11 13.16 - Centrifugal Gas Handling Fans
43 11 23 - Gas Handling Blowers

Project Experience

  • Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • LEED Experience
  • BIM Experience

Diversity

  • Small Business Enterprise

Gallery

Featured Image 1
Commercial
Featured Image 2
Commercial
Featured Image 3
Commercial
Featured Image 4
About Us

Associations & Memberships

Sheet Metal Workers Local 10
Sheet Metal Workers Local 10
SMACNA (Sheet Metal & Air Conditioning Contractors Assn. of Bay Area)
SMACNA (Sheet Metal & Air Conditioning Contractors Assn. of Bay Area)

Preferred Brands

AAON
AAON
Bryant Heating & Cooling Systems
Bryant Heating & Cooling Systems
Burnham by U.S. Boiler Co.
Burnham by U.S. Boiler Co.
Carrier Heating & Air Conditioning
Carrier Heating & Air Conditioning
Magic-Pak
Magic-Pak
McQuay Air Conditioning
McQuay Air Conditioning
Share URL copied!
https://www.thebluebook.com/iProView/366698/optimum-mechanical-systems-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.