Logo

Glen/Mar Construction, Inc.

Share

Clackamas, OR 97015

Company Info

  • Est. 1985
  • Size 20-49 Employees
  • Annual Vol $20 million - $50 million

Featured Project Return to Projects List

Bakersfield National Cemetery

Project Information

Project Location:
Bakersfield, CA
Approx Contract:
$16,300,000
Status:
Completed - Jun 2011
Structure Type:
Non-Residential Building

References

Owner:
National Cemetery Administration, Department of Veterans Affairs
General Contractor:
Glen/Mar Construction, Inc.
Client:
National Cemetery Administration, Department of Veterans Affairs

Scope Of Work

D/B/B 23+ ACRE NATIONAL CEMETERY EXPANSION

  • Horizontal and vertical construction
  • Developing 5.5 acres of new in-ground burial sections
    • Mass excavation of 55,000 cubic yards of overburden
    • Installation of 4000 Precast Concrete Burial Crypts [A]
    • Landscaping, requiring backfill and final grading of the new crypt fields

CONSTRUCTION AND BUILDOUT

  • New building/structure construction over multiple, concurrent work sites
    • All buildings were fitted with fire alarm and detection systems; security and surveillance systems; intrusion detection and alarm systems; IT wiring and fiber optics
  •  (2) Columbarium Courts for 3,000 Precast Cremation Niches [B]
    • Columbarium walls constructed of stained, cast-in-place concrete
    • Marble niche covers adorning the face of the 1,200 cremation niches
  • (2) Small committal shelters for the use of public internment services [C]
  • New 3,200 sqft Administration & Public Information building [D]
  • New 1,100 sqft Public Restroom building
  • New 5,000 sqft Pre-Engineered Facility Maintenance Building [E], including:
    • A vehicle wash bay and an equipment wash room designed to clean both large cemetery operational equipment, smaller equipment, and hand tools. 
    • Vehicle wash bay and equipment room drained through an oil/water separator
    • New 55,000 sqft maintenance yard facility with 7.5” PCC paving
  • 900 sqft Pre-Engineered Material Storage Building [F]
  • New 3,150 sqft pre-engineered 10-bay vehicle canopy structure [G]
  • Relocated 1,800 sqft pre-engineered material storage building

CIVIL WORK

  • New underground utility systems including power, sanitary, storm, and domestic water
  • Water system included a new 700 VF well with an 81,000 gal above ground storage tank
  • Demolition, grading, roadways, walkways, landscaping and irrigation

ASSOCIATED SITE IMPROVEMENTS

  • New Roads
  • New Walkways
  • New Utility Systems, i.e. Water, Power, Storm & Sanitary
  • Development of 700’ Water Well with 81,000 GAL Above-Ground Storage Tank

SUSTAINABLE FEATURES

  • Installation of DCC Controlled Mechanical Systems
  • On-Site Storm Water Detention Facilities
  • Low-E glazing systems, low-flow plumbing fixtures, and high-efficiency lighting
  • Low VOC paint materials and extensive use of recycled materials

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/360763/glen-mar-construction-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.