Logo

Ark Contracting Services, LLC

Kennedale, TX 76060

Company Info

  • Est. 1998
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Ark Contracting Services, LLC (ACS) focuses on gabion structures, concrete structures, retaining walls, pipelines, earth anchor systems, erosion protection and dredging projects.

What We Do

Commercial Experience

Civil & Site Development Misc Project
Non-Residential Building Park / Playground

Regions & Counties Serviced

  • Dallas, Fort Worth

Texas All

Our CSI Codes

01 73 23 - Bracing and Anchoring
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
04 22 33 - Interlocking Concrete Unit Masonry
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
06 13 33 - Heavy Timber Pier Construction
07 76 13 - Roof Ballast Pavers
07 76 16 - Roof Decking Pavers
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 13 23 - Sanitary Waste Interceptors
22 13 26 - Sanitary Waste Separators
22 13 29.33 - Sewerage Pump Basins and Pits
22 13 36 - Packaged, Wastewater Pump Units
22 13 43 - Facility Packaged Sewage Pumping Stations
22 13 43.13 - Facility Dry-Well Packaged Sewage Pumping Stations
22 13 43.16 - Facility Wet-Well Packaged Sewage Pumping Stations
22 14 13 - Facility Storm Drainage Piping
22 14 29.19 - Sump-Pump Basins and Pits
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 21 16.13 - Methane Venting
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
31 36 13 - Gabion Boxes
31 36 19 - Gabion Mattresses
31 36 19.13 - Vegetated Gabion Mattresses
31 53 13 - Timber Cribwork
31 63 19.13 - Rock Sockets for Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 06 30.13 - Retaining Wall Schedule
32 14 13 - Precast Concrete Unit Paving
32 14 13.13 - Interlocking Precast Concrete Unit Paving
32 14 13.19 - Porous Precast Concrete Unit Paving
32 14 16 - Brick Unit Paving
32 14 23 - Asphalt Unit Paving
32 14 26 - Wood Paving
32 14 40 - Stone Paving
32 14 43 - Porous Unit Paving
32 30 00.00.01 - Site Improvements
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 10 - Operation and Maintenance of Water Utilities
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 01 30.52 - Pond and Reservoir Maintenance
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 50 - Schedules for Fuel Distribution Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 10 - Instrumentation and Control for Water Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 12 23 - Water Utility Pumping Stations
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 32 13 - Packaged Utility Lift Stations
33 32 13.13 - Packaged Sewage Lift Stations, Wet Well Type
33 32 16 - Packaged Utility Wastewater Pumping Stations
33 32 16.13 - Packaged Sewage Grinder Pumping Units
33 32 19 - Public Utility Wastewater Pumping Stations
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 01 50.71 - Channel Excavation, Cleaning and Deepening
35 05 30 - Common Work Results for Coastal Construction
35 05 40 - Common Work Results for Waterway Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 40 - Schedules for Waterway Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 20 23 - Dredging
35 20 23.13 - Mechanical Dredging
35 20 23.23 - Hydraulic Dredging
35 20 23.33 - Integrated Dredging and Dewatering
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.16 - Segmental Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.36 - Gabion Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.36 - Gabion Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 31 29.36 - Gabion Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 36 - Gabion Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 36 - Gabion Scour Protection
35 43 37 - Riprap Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 23 - Underwater Harbor Deepening
35 53 33 - Underwater Pipeline Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 13 - Earth Embankment Dam
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
40 23 36 - Sanitary Water Process Piping
41 14 16 - Batch Cars/Transports
41 14 19 - Batch Hoppers
43 01 10 - Operation and Maintenance of Gas Handling Equipment
43 01 20 - Operation and Maintenance of Liquid Handling Equipment
44 41 13 - Packaged Water Treatment Plants
44 41 13.13 - Chemical Packaged Water Treatment Plants
44 41 13.16 - Biological Packaged Water Treatment Plants
44 41 13.19 - Thermal Packaged Water Treatment Plants
44 46 26 - Sludge Thickeners

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects From $100,000 to $2,000,000

Gallery

Featured Image 1
Gabions - Farmers Branch Creek
Featured Image 2
Timber Creek
Featured Image 3
Shoring - Park Lane Place
Featured Image 4
Timber Creek

Associations & Memberships

NUCA (National Utility Contractors Assn.)
NUCA (National Utility Contractors Assn.)
TEXO
TEXO
Share URL copied!
https://www.thebluebook.com/iProView/352542/ark-contracting-services-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.