Logo

Norr Building Corp.

West Palm Beach, FL 33404

Company Info

  • Est. 1986
  • Size 5-9 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Norr Building Corp. has been in business since 1986.

Our main lines of business include: Foundation Contractors--Geotechnical & Specialty

We are located in the Riviera Beach, Florida area.

What We Do

Commercial Experience

Marine Swimming Pool
Animal Hospital / Kennel Arena / Stadium Assisted Living Auto Dealership / Service Bank Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Historic Preservation Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Medical Office Misc Project Mixed Use Museum Non-Residential Building Parking Garage Post Office Radio / Television Station Residential Building Restaurant Retail Store School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Terminal - Airport / Bus / Railroad Theater

Regions & Counties Serviced

  • Florida-South-West Palm Beach, Miami, Naples

Florida 9

  • Brevard
  • Broward
  • Hendry
  • Indian River
  • Martin
  • Miami-dade
  • Okeechobee
  • Palm Beach
  • Saint Lucie

Our CSI Codes

02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 01 70 - Maintenance of Mass Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 06 60 - Schedules for Grouting
03 06 70 - Schedules for Mass Concrete
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
03 61 13 - Dry-Pack Grouting
03 62 13 - Non-Metallic Non-Shrink Grouting
03 62 16 - Metallic Non-Shrink Grouting
03 64 23 - Epoxy Injection Grouting
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
31 01 40 - Maintenance of Shoring and Underpinning
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 06 40 - Schedules for Shoring and Underpinning
31 06 60.13 - Driven Pile Schedule
31 09 16.23 - Driven Pile Load Tests
31 32 23 - Pressure Grouting Soil Stabilization
31 32 23.13 - Cementitious Pressure Grouting Soil Stabilization
31 32 23.16 - Chemical Pressure Grouting Soil Stabilization
31 32 36.16 - Grouted Soil Nailing
31 32 36.23 - Jet-Grouted Soil Nailing
31 32 36.26 - Launched Soil Nailing
31 33 13 - Rock Bolting and Grouting
31 40 00.00.01 - Shoring and Underpinning
31 41 16 - Sheet Piling
31 41 16.13 - Steel Sheet Piling
31 41 16.16 - Plastic Sheet Piling
31 43 13 - Pressure Grouting
31 43 13.13 - Concrete Pressure Grouting
31 43 13.16 - Polyurethane Pressure Grouting
31 43 16 - Compaction Grouting
31 48 13 - Underpinning Piers
31 48 33 - Micropile Underpinning
31 62 13 - Concrete Piles
31 62 13.13 - Cast-in-Place Concrete Piles
31 62 13.16 - Concrete Displacement Piles
31 62 13.19 - Precast Concrete Piles
31 62 13.23 - Prestressed Concrete Piles
31 62 13.26 - Pressure-Injected Footings
31 62 16 - Steel Piles
31 62 16.13 - Sheet Steel Piles
31 62 16.16 - Steel H Piles
31 62 16.19 - Unfilled Tubular Steel Piles
31 62 19 - Timber Piles
31 62 23 - Composite Piles
31 62 23.13 - Concrete-Filled Steel Piles
31 62 23.16 - Wood and Cast-In-Place Concrete Piles
31 63 13 - Bored and Augered Test Piles
31 63 16 - Auger Cast Grout Piles
31 63 19 - Bored and Socketed Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 66 13 - Special Piles
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
34 82 19.13 - Bridge Pier Ice Shields
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 42 13 - Piling Bank Protection
35 42 13.19 - Steel Sheet Piling Bank Protection
35 42 13.23 - Timber Piling Bank Protection
35 42 13.26 - Plastic Piling Bank Protection
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 59 13.13 - Prestressed Concrete Marine Fender Piling
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 74 13 - Concrete Buttress Dams

Project Experience

  • Non-Union
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Projects Up to $100,000

Diversity

  • Small Business Enterprise

Gallery

Featured Image 1
Helical Piles
Featured Image 2
Helical Piles
Featured Image 3
Helical Piles

Preferred Brands

AB Chance
AB Chance
MacLean Dixie HFS
MacLean Dixie HFS
Share URL copied!
https://www.thebluebook.com/iProView/349722/norr-building-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.