Logo

Cooley Construction, Inc.

Hesperia, CA 92345

Company Info

  • Est. 1976
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Pride, professionalism, and responsibility have become the hallmarks of our success. Cooley Construction's founding fathers established the guidelines that have shaped the basic principles that we continue to adhere to today. We firmly believe that our time-tested philosophy of doing each job right the first time and providing good value to our customers is the true secret of our success. Cooley Construction, Inc. prides itself in its work, reliability, stability, safety, and above all, customer satisfaction.

What We Do

  • Excavating Contractors
  • General Engineering Contractors
  • Paving Contractors

Commercial Experience

Road / Highway
Parking Lots

Regions & Counties Serviced

  • Orange, Riverside and San Bernardino Counties

California 1

  • San Bernardino

Our CSI Codes

31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 41 16 - Levee Cutoff Trenches

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects From $2,000,001 to $2,000,000,000

Gallery

Featured Image 1
Mall Road Project Photo 1
Featured Image 2
Mall Road Project Photo 2
Featured Image 3
Corwin Road Project Photo 1
Featured Image 4
Corwin Road Project Photo 2
Share URL copied!
https://www.thebluebook.com/iProView/335247/cooley-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.