Featured Project Return to Projects List
Chino Valley Wastewater Treatment Facility
Project Information
- Project Location:
- Chino Valley, AZ
- Approx Contract:
- $20,000,000
- Status:
- Completed - Jan 2004
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- Town of Chino Valley
- Architect:
- Aqua Engineering
Scope Of Work
This project was developed as a unique private/public partnership. Fann Contracting financed and constructed this 1.0 mgd facility. This Construction Manager at Risk project was completed by the Fann Environmental team with design by Aqua Engineering, Inc. and included the construction of a one million gallon a day Enviroquip/Kubota MBR treatment plant, lift station, effluent booster facility, and gravity main. The Fann Environmental team began work on this project at the 60% design phase. The work included scheduling, constructability reviews, and value engineering during preconstruction. The Fann Environmental team visited MBR treatment plants and assisted the design engineer with equipment selection. It also developed cost saving changes to the headworks and piping schemes. Fann Environmental is currently providing operational and maintenance services to Fann Contracting, Inc. for this facility