Logo

J.M. Clayton Company

Share

Thomaston, GA 30286

Company Info

  • Est. 1906
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

J.M. Clayton Company has been in business for 114 years.  We are a Mechanical and Electrical Contractor in the state of Georgia. Quality, competence, and an ability to see and satisfy customer needs are the basic requirements for the endurance and continued success of any business enterprise and these qualities could not be better reflected than they are in the long, proud and respected history of J. M. Clayton Company. From the beginning, the Company has insisted that all workmanship would be first class, and that ethics, honesty, and integrity would be the company’s trademark.

 

What We Do

Commercial Experience

Jail / Prison Library
Airport Runway Animal Hospital / Kennel Athletic Field Auto Dealership / Service Bank City / Town Hall Court House Design Build Fire / Police Station Hospital / Nursing Home Industrial Maintenance Laboratory Manufacturing Plant Medical Office Mixed Use Non-Building Construction Non-Residential Building Office Building Parking Garage Parking Lots School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Utilities

Regions & Counties Serviced

  • Georgia

Georgia 1

  • Upson

Our CSI Codes

01 93 13 - Facility Maintenance Procedures
02 01 80 - Maintenance of Facility Remediation
22 01 60 - Operation and Maintenance of Laboratory and Healthcare Systems
22 06 60 - Schedules for Laboratory and Healthcare Systems
22 11 13 - Facility Water Distribution Piping
22 15 13 - General Service Compressed-Air Piping
22 60 00.00.01 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 61 13 - Compressed-Air Piping for Laboratory and Healthcare Facilities
22 61 13.53 - Laboratory Compressed-Air Piping
22 61 13.70 - Healthcare Compressed-Air Piping
22 61 13.74 - Dental Compressed-Air Piping
22 61 19.70 - Healthcare Compressed-Air Equipment
22 62 13 - Vacuum Piping for Laboratory and Healthcare Facilities
22 62 13.53 - Laboratory Vacuum Piping
22 62 13.70 - Healthcare, Surgical Vacuum Piping
22 62 13.74 - Dental Vacuum Piping
22 62 23 - Waste Anesthesia-Gas Piping
22 63 13 - Gas Piping for Laboratory and Healthcare Facilities
22 63 13.53 - Laboratory Gas Piping
22 63 13.70 - Healthcare Gas Piping
22 66 53 - Laboratory Chemical-Waste and Vent Piping
22 66 70 - Healthcare Chemical-Waste and Vent Piping
22 66 83 - Chemical-Waste Tanks
22 67 13 - Processed Water Piping for Laboratory and Healthcare Facilities
22 67 13.13 - Distilled-Water Piping
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 10 - Schedules for Facility Fuel Service Systems
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50.13 - Heating Boiler Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 10 00.00.01 - Facility Fuel Systems
23 11 13 - Facility Fuel-Oil Piping
23 11 23 - Facility Natural-Gas Piping
23 20 00.00.01 - HVAC Piping and Pumps
23 21 13.23 - Aboveground Hydronic Piping
23 22 13 - Steam and Condensate Heating Piping
23 22 13.23 - Aboveground Steam and Condensate Heating Piping
23 24 16 - Internal-Combustion Engine Exhaust Piping
23 30 00.00.01 - HVAC Air Distribution
25 05 26 - Grounding and Bonding for Integrated Automation
25 36 16 - Integrated Automation KW Transducers
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 01 30 - Operation and Maintenance of Facility Electrical Power Generating and Storing Equipment
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 06 30 - Schedules for Facility Electrical Power Generating and Storing Equipment
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 26 00.00.01 - Power Distribution Units
26 32 13 - Engine Generators
26 32 13.13 - Diesel-Engine-Driven Generator Sets
26 32 13.16 - Gas-Engine-Driven Generator Sets
26 32 16 - Steam-Turbine Generators
26 32 19 - Hydro-Turbine Generators
26 32 33 - Rotary Uninterruptible Power Units
26 33 23 - Central Battery Equipment
26 33 33 - Static Power Converters
26 33 46 - Battery Monitoring
26 33 53 - Static Uninterruptible Power Supply
26 35 33 - Power Factor Correction Equipment
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
33 71 26.13 - Capacitor Banks
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
40 01 10 - Operation and Maintenance of Gas and Vapor Process Piping
40 01 20 - Operation and Maintenance of Liquids Process Piping
40 01 40 - Operation and Maintenance of Process Piping and Equipment Protection
40 05 13 - Common Work Results for Process Piping
40 05 13.13 - Steel Process Piping
40 05 13.16 - Lined or Internally-Coated Steel Process Piping
40 05 13.19 - Stainless-Steel Process Piping
40 05 13.23 - Aluminum Alloys Process Piping
40 05 13.33 - Brass, Bronze, Copper, and Copper Alloys Process Piping
40 05 13.43 - Nickel and Nickel Alloys Process Piping
40 05 13.53 - Ductile, Malleable, and Cast Iron Alloys Process Piping
40 05 13.63 - Titanium and Titanium Alloys Process Piping
40 05 13.73 - Plastic Process Piping
40 05 13.76 - Fiberglass-Reinforced Plastic and Resins Process Piping
40 05 13.93 - Other Metals Process Piping
40 06 10 - Schedules for Gas and Vapor Process Piping
40 06 20 - Schedules for Liquids Process Piping
40 06 30 - Schedules for Solid and Mixed Materials Piping and Chutes
40 06 40 - Schedules for Process Piping and Equipment Protection
40 10 00.00.01 - Gas and Vapor Process Piping
40 11 13 - Low-Pressure Steam Process Piping
40 11 16 - Intermediate-Pressure Steam Process Piping
40 11 19 - High-Pressure Steam Process Piping
40 11 23 - Condensate Process Piping
40 12 13 - Breathing Compressed Air Process Piping
40 12 16 - Non-Breathing Compressed Air Process Piping
40 13 13 - Argon Process Piping
40 13 16 - Carbon-Dioxide Process Piping
40 13 19 - Helium Process Piping
40 13 23 - Krypton Process Piping
40 13 26 - Neon Process Piping
40 13 29 - Nitrogen Process Piping
40 13 33 - Xenon Process Piping
40 13 93 - Mixed Inert Gases Process Piping
40 14 16 - Blue (Water) Fuel Gas Piping
40 14 19 - Butane Piping
40 14 23 - Carbon-Monoxide Piping
40 14 26 - Chlorine Fuel Gas Piping
40 14 33 - Ethane-Gas Piping
40 14 36 - Hydrogen Fuel Gas Piping
40 14 39 - Liquid Natural-Gas Process Piping
40 14 43 - Methylacetylene-Propadiene Fuel Gas Piping
40 14 49 - Natural-Gas Process Piping
40 14 49.13 - Synthetic Natural-Gas Piping
40 14 49.23 - Propane-Air Mixes Fuel Gas Piping
40 14 53 - Octane Fuel Gas Piping
40 14 59 - Propane Fuel Gas Process Piping
40 14 63 - Sewage Fuel Gas Piping
40 14 93 - Mixed Fuel Gases Piping
40 15 13 - Combustion Air Piping
40 15 16 - Oxygen Combustion System Gas Piping
40 15 23 - Exothermic-Gas Combustion System Piping
40 15 26 - Endothermic-Gas Combustion System Piping
40 15 29 - Disassociated-Ammonia-Gas Combustion System Piping
40 16 13 - Ammonia Gas Piping
40 16 16 - Boron Gas Piping
40 16 26 - Diborane Gas Piping
40 16 29 - Fluorine Gas Piping
40 16 33 - Hydrogen Sulfide Gas Piping
40 16 36 - Nitrous-Oxide Gas Process Piping
40 16 39 - Ozone Gas Piping
40 16 43 - Phosphine Gas Piping
40 16 46 - Silane Gas Piping
40 16 49 - Sulfur-Dioxide Gas Piping
40 16 53 - Specialty Gas Mixtures Piping
40 18 13 - Low-Vacuum Systems Process Piping
40 18 16 - High-Vacuum Systems Process Piping
40 20 00.00.01 - Liquids Process Piping
40 21 13 - Bio Fuels Process Piping
40 22 16 - Light-Fractions Petroleum Products Piping
40 23 13 - De-Ionized Water Process Piping
40 23 16 - Distilled-Water Process Piping
40 23 19 - Process Plant Water Piping
40 23 23 - Potable Water Process Piping
40 23 29 - Recirculated Water Process Piping
40 23 33 - Reverse-Osmosis Water Process Piping
40 24 13 - Alcohol Piping
40 24 16 - Gel Piping
40 24 19 - Slurries Process Piping
40 24 23 - Thixotropic Liquid Piping
40 25 13 - Liquid Acids Piping
40 25 16 - Liquid Bases Piping
40 26 00.00.01 - Liquid Polymer Piping
40 95 73 - Process Control Wiring
41 01 40 - Operation and Maintenance of Container Processing and Packaging
41 01 60 - Operation and Maintenance of Mobile Plant Equipment
41 06 40 - Schedules for Container Processing and Packaging
41 06 50 - Schedules for Material Storage
41 06 60 - Schedules for Mobile Plant Equipment
41 08 10 - Commissioning of Bulk Material Processing Equipment
41 08 20 - Commissioning of Piece Material Handling Equipment
41 08 40 - Commissioning of Container Processing and Packaging
41 08 50 - Commissioning of Material Storage
41 08 60 - Commissioning of Mobile Plant Equipment
41 65 16 - Mobile Generators
42 14 16 - Atmosphere Generators
43 01 30 - Operation and Maintenance of Gas and Liquid Hi-Purification Equipment
48 01 10 - Operation and Maintenance of Electrical Power Generation Equipment
48 01 70 - Operation and Maintenance of Electrical Power Generation Testing
48 05 00.00.01 - Common Work Results for Electrical Power Generation
48 06 10 - Schedules for Electrical Power Generation Equipment
48 06 70 - Schedules for Electrical Power Generation Testing
48 09 00.00.01 - Instrumentation and Control for Electrical Power Generation
48 10 00.00.01 - Electrical Power Generation Equipment
48 11 26 - Fossil Fuel Electrical Power Plant Generators
48 12 23 - Nuclear Fuel Electrical Power Plant Steam Generators
48 12 33 - Nuclear Fuel Electrical Power Generators
48 13 16 - Hydroelectric Power Plant Electrical Power Generators
48 16 23 - Geothermal Energy Electrical Power Generators
48 17 13 - Electrical Power Generation Batteries
48 18 13 - Electrical Power Generation Fuel Cells
48 19 13 - Electrical Power Generation Battery Charging Equipment
48 19 23 - Electrical Power Generation Transformers
48 19 26 - Electrical Power Generation Voltage Regulators

Project Experience

  • Union
  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Projects From $500,000 to $10,000,000

Gallery

Featured Image 1
About Us - Services
Featured Image 2
About Us - Services
Featured Image 3
About Us - Services
Featured Image 4
About Us - Services
Service Area and Locations Map for J.M. Clayton Company

Associations & Memberships

NFPA (National Fire Protection Assn.)
NFPA (National Fire Protection Assn.)
NECA (National Electrical Contractors Assn.)
NECA (National Electrical Contractors Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/320617/j-m-clayton-company/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.