Our Story

Central Reclamation and its CEO Ron Fox have completed many successful jobs. Ranging in size, scope and budgets, Central Reclamation is equipped to handle a variety of jobs. With its extensive fleet of machinery and vast knowledge of the industry, Central Reclamation has become a pioneer in the demolition business.

Central Reclamation has successfully and safely completed such projects as steel plants, refineries, power plants, tank farms, commercial and residential projects.

In addition to demolition, Central Reclamation has expanded its expertise to shoring, excavation, earth retention systems and environmental drilling. 

In an effort to maximize productivity safely, Central Reclamation utilizes LEAD AWARENESS TRAINING, 40 HOUR HAZWOPER TRAINING, random drug and alcohol testing for all employees as well as periodic physicals for our truck drivers and equipment operators.

At Central Reclamation, we strive to be the premier provider of services to industrial, commercial and residential customers by providing the highest quality and value to each and every customer.

What We Do

Commercial Experience

Misc Project
Apartments & Condominiums Design Build House Manufacturing Plant Non-Residential Building Office Building Parking Lots Residential Building Swimming Pool

Regions & Counties Serviced

  • California-Los Angeles and Vicinity

Arizona All

California All

Nevada All

Oregon All

Utah All

Washington All

Our CSI Codes

01 73 23 - Bracing and Anchoring
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 57 16 - Sinkhole Remediation by Backfilling
02 58 16 - Snow Avalanche Control
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
03 06 30.23 - Concrete Shaft Schedule
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
11 92 23 - Agricultural Waste Clean-Up Equipment
23 01 60.71 - Refrigerant Recovery/Recycling
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 01 63 - Maintenance of Bored and Augered Piles
31 01 63.61 - Bored and Augered Pile Repairs
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 06 60.16 - Caisson Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
31 32 36 - Soil Nailing
31 32 36.13 - Driven Soil Nailing
31 32 36.19 - Corrosion-Protected Soil Nailing
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 13 - Cantilever Needle Beams
31 48 19 - Bracket Piers
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 53 13 - Timber Cribwork
31 54 00.00.01 - Ground Freezing
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 63 26 - Drilled Caissons
31 63 26.13 - Fixed End Caisson Piles
31 63 26.16 - Concrete Caissons for Marine Construction
31 63 29 - Drilled Concrete Piers and Shafts
31 63 29.13 - Uncased Drilled Concrete Piers
31 63 33 - Drilled Micropiles
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
31 75 13 - Cast-in-Place Concrete Shaft Lining
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 06 30.13 - Retaining Wall Schedule
32 30 00.00.01 - Site Improvements
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 31 16.16 - Segmental Seawalls
35 41 16 - Levee Cutoff Trenches
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 53 43 - Underwater Foundation Construction
35 73 13 - Earth Embankment Dam
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects Up to $2,500,000

Gallery

Featured Image 1
Drilling Contractors & Equipment
Featured Image 2
Shoring Contractors
Featured Image 3
Caissons
Featured Image 4
Excavating Contractors

Associations & Memberships

NADC (National Assn. Of Demolition Contractors)
NADC (National Assn. Of Demolition Contractors)
WBENC (Women's Business Enterprise National Council)
WBENC (Women's Business Enterprise National Council)
LEED (Leadership in Energy and Environmental Design)
LEED (Leadership in Energy and Environmental Design)

Preferred Brands

Recycling
Recycling
Share URL copied!
https://www.thebluebook.com/iProView/313780/central-reclamation/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.