Logo

U. S. Demolition, Inc.

Anaheim, CA 92807

Company Info

  • Est. 1999
  • Size 50-99 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

 

U.S. Demolition Inc. has been performing turnkey demolition & hazardous remediation projects for its clients since 1999.

  • Demolition Contractor 
  • Concrete Breaking, sawing & Drilling
  • Asbestos Removal & Consultation
  • Site Development 
  • We also provide Interior Soft Demolition 

With an excellent safety record and a long list of satisfied clients, U.S. Demolition is one of the leaders in the industry.

U.S. Demolition possesses the ability to handle any size project,  as well as knowledgeable and experienced personnel.

Visit our WEBSITE Call Direct 714-695-9026

 

What We Do

Commercial Experience

Apartments & Condominiums Arena / Stadium
Animal Hospital / Kennel Auto Dealership / Service Bank Casinos Church / Synagogue Civil & Site Development Dams & Levies Data Centers - Mission Critical Education (K-12) Fire / Police Station Gas Station Government Grocery Stores Hotel / Motel Jail / Prison Laboratory Medical Office Misc Project Non-Building Construction Non-Residential Building Office Building Parking Garage Retail Store Secure and Shielded Facilities Storage Facility / Warehouse Terminal - Airport / Bus / Railroad

Regions & Counties Serviced

  • California-Los Angeles and Vicinity

California 10

  • Imperial
  • Kern
  • Los Angeles
  • Orange
  • Riverside
  • San Bernardino
  • San Diego
  • San Luis Obispo
  • Santa Barbara
  • Ventura

Our CSI Codes

01 73 29 - Cutting and Patching
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 06 80 - Schedules for Facility Remediation
02 25 19.13 - Masonry Assessment Drilling
02 26 23 - Asbestos Assessment
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 16 - Snow Avalanche Control
02 61 26 - Removal and Disposal of Asbestos Contaminated Soils
02 82 13 - Asbestos Abatement
02 82 13.13 - Glovebag Asbestos Abatement
02 82 13.16 - Precautions for Asbestos Abatement
02 82 13.19 - Asbestos Floor Tile and Mastic Abatement
02 82 16 - Engineering Control of Asbestos Containing Materials
02 82 33 - Removal and Disposal of Asbestos Containing Materials
03 01 80 - Maintenance of Concrete Cutting and Boring
03 06 80 - Schedules for Concrete Cutting and Boring
03 80 00.00.01 - Concrete Cutting and Boring
03 81 13 - Flat Concrete Sawing
03 81 16 - Track Mounted Concrete Wall Sawing
03 81 19 - Wire Concrete Wall Sawing
03 81 23 - Hand Concrete Wall Sawing
03 81 26 - Chain Concrete Wall Sawing
03 82 13 - Concrete Core Drilling
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 73 13 - Earth Embankment Dam

Project Experience

  • Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Projects From $100,000 to $5,000,000
  • LEED Experience

Diversity

  • Small Business Enterprise

Gallery

Featured Image 1
Demolition Progress - July 1st
Featured Image 2
Demolition Progress - July 5th
Featured Image 3
Demolition Progress - July 10th
Featured Image 4
Demolition Progress - July 13th

Associations & Memberships

NDA (National Demolition Assn.)
NDA (National Demolition Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/307899/u-s-demolition-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.