This project included the construction of the single span Route 403 Bridge No. 1009 and construction of the highway approaches to this structure. The constructed single span structure consists of steel plate girders, reinforced concrete abutments and decks, mechanically stabilized earth (MSE) retaining walls, granite curbing, protective screens, and other incidentals. The highway work included construction of sections of Relocated Route 403 to bituminous surface course level, jacking steel casing under an AMTRAK right-of-way, complete construction of a drainage basin. Turino worked collaboratively with the design team to ensure constructability of all structural components, and monitored the schedule to identify potential risks or delays.

 