Great Island Bridge Replacement (4D Scheduling)

Project Location:
Narragansett, RI
Approx Contract:
$8,500,000
Est Completion:
Mar 2017

References

Owner:
RIDOT
Architect:
Not Provided
General Contractor:
Not Provided

Scope Of Work

Turino led a team that modeled and developed the 4D Schedule for this bridge replacement. By highlighting the construction sequence with the representation of construction equipment, we assisted in conveying the size impacts of equipment choices. Additional work consists of tracking the progress of this project during construction, assisting RIDOT in identifying potential risks through the 4D model, and  producing videos and stills to aid in design collaboration and the bidding process. 