Apponaug Circulator (4D Scheduling)
Project Information
- Project Location:
- warwick, RI
- Approx Contract:
- $29,900,000
- Status:
- In-Progress - Oct 2017
- Structure Type:
- Road / Highway
References
- Owner:
- RIDOT
- Architect:
- Not Provided
- General Contractor:
- Not Provided
Scope Of Work
Turino modeled a proposed five roundabout design and phasing while closely tracking the progress of this project during construction. The project consists of continuous updates to the 4D model based on actual progress and documents the project on a bi-weekly basis using aerial photography. Additional tasks include assisting RIDOT in discussing logistics, sequencing, utility coordination, and maintaining traffic flow.