Featured Project Return to Projects List

Planet Fitness

Project Information

Project Location:
Peckville, PA
Approx Contract:
$1,000,000
Status:
Completed - Dec 2019
Structure Type:
Fitness Center

References

General Contractor:
Tricon Construction

Scope Of Work

Open Phase Remodel Scope of Work:

  • Demolition - Select Demolition, Demolition existing front locker room wall,
  • Concrete Saw Cutting - for plumbing and electrical work, Cut remove, and put back when Electrical and Plumbing are complete.
  • Masonry EIFS - Facade and Stucco work
  • Structural Steel - Structure work on the facade, and maybe around the RTU openings
  • Roofing - Patch around Plumbing, Gas, and exhaust fan penetrations.
  • Storefront - New exterior Store front doors
  • Acoustical - Supply and Install New ACT Tile and Grid throughout space, Per plan
  • Framing & Drywall- Supply and install Metal Framing and Sheetrock, Spackle ready for Paint. (Add Alt to include Demising wall)
  • Ceramic Tile-Install Owner Supplied tile.  Sub to supply Thin Set, Grout, Water proofing, Schluter outside corners.
  • Rubber Flooring-Install Owner supplied Materials
  • Vinyl Base-Supply and install Vinyl Cove Base throughout space.
  • Floor Patch-Skim Coat entire floor ready for Rubber Floor install.
  • Painting-Paint Ceilings (Dry fall), walls, doors, and frames as per plans.
  • Sprinkler-Contractor is to supply and install code compliant system as per plans.  Contractor is responsible for Permit & Permit cost (will be reimbursed), Inspections.  Existing heads will need to be relocated
  • Plumbing-Install Owner Supplied Light fixtures, Contractor is responsible for, all rough plumbing work and materials, all gas piping as per plans. Contractor is responsible for Permit & Permit cost (will be reimbursed), Inspections. Underground excavation.
  • HVAC- Supply and install new Ductwork, Install new RTU's   Supply and install ductwork, flext duct, grilles, registers & bathroom exhaust fans. Contractor is responsible for Permit & Permit cost &Inspections.  Additional Line item for Supply RTU's
  • Electric - Supply and install Power as Per plans.  Install Owner Supplied Light fixtures, Contractor is responsible for Permit & Permit cost & Inspections.
  • Fire Alarm - Supply and install new fire alarm system as per plans. Contractor is responsible for Engineering, Permit cost & Inspections. A few horns and strobes will have to be relocated.

Project Images

#
#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/266671/tricon-construction/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.