Featured Project

Solar Field

Scandia , MN
Scope Of Work:

We installed the 13.8KV Medium voltage infrastructure.  This included setting and wiring transformers taking the 480V from the inverters  in the field and bumping it up to 13.8KV

We installed the wire, poles, arresters, cut outs, and GOABS (Ground Operated Air Break Switch)

We did Tan Delta/VHF Testing on the MV105 medium voltage cabling.