Logo

Slagle Mechanical

Sidney, OH 45365

Company Info

  • Est. 1941
  • Size 50-99 Employees
  • Annual Vol $10 million - $20 million

People Also View These
Loading...

Our Story

Skilled technicians. Reasonable prices. Round-the-clock service. A complete commitment to perform our services to exceed your every expectation.

As a full-service repair and installation plumbing, heating, and air conditioning company, Slagle Mechanical has been in business over 60 years, and has been an integral and respected part of the plumbing & heating industry in Ohio.

Since our incorporation we have serviced the Commercial, Industrial, Institutional and Medical Mechanical service needs of our clients.

Commercial Experience

Education (K-12) Laboratory School / College / University Storage Facility / Warehouse
Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service City / Town Hall Court House Design Build Fire / Police Station Hospital / Nursing Home Industrial Maintenance Jail / Prison Library Manufacturing Plant Medical Office Museum Post Office Radio / Television Station Sewage / Water Treatment Plant Terminal - Airport / Bus / Railroad Theater

Regions & Counties Serviced

  • Cincinnati, Columbus, Dayton - Southern Ohio

Ohio 17

  • Allen
  • Auglaize
  • Champaign
  • Clark
  • Darke
  • Greene
  • Hancock
  • Hardin
  • Logan
  • Mercer
  • Miami
  • Montgomery
  • Preble
  • Putnam
  • Shelby
  • Union
  • Van Wert

Our CSI Codes

01 93 13 - Facility Maintenance Procedures
02 01 80 - Maintenance of Facility Remediation
22 01 60 - Operation and Maintenance of Laboratory and Healthcare Systems
22 06 60 - Schedules for Laboratory and Healthcare Systems
22 11 13 - Facility Water Distribution Piping
22 15 13 - General Service Compressed-Air Piping
22 60 00.00.01 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 61 13 - Compressed-Air Piping for Laboratory and Healthcare Facilities
22 61 13.53 - Laboratory Compressed-Air Piping
22 61 13.70 - Healthcare Compressed-Air Piping
22 61 13.74 - Dental Compressed-Air Piping
22 61 19.70 - Healthcare Compressed-Air Equipment
22 62 13 - Vacuum Piping for Laboratory and Healthcare Facilities
22 62 13.53 - Laboratory Vacuum Piping
22 62 13.70 - Healthcare, Surgical Vacuum Piping
22 62 13.74 - Dental Vacuum Piping
22 62 23 - Waste Anesthesia-Gas Piping
22 63 13 - Gas Piping for Laboratory and Healthcare Facilities
22 63 13.53 - Laboratory Gas Piping
22 63 13.70 - Healthcare Gas Piping
22 66 53 - Laboratory Chemical-Waste and Vent Piping
22 66 70 - Healthcare Chemical-Waste and Vent Piping
22 66 83 - Chemical-Waste Tanks
22 67 13 - Processed Water Piping for Laboratory and Healthcare Facilities
22 67 13.13 - Distilled-Water Piping
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 10 - Schedules for Facility Fuel Service Systems
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 50.13 - Heating Boiler Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 10 00.00.01 - Facility Fuel Systems
23 11 13 - Facility Fuel-Oil Piping
23 11 23 - Facility Natural-Gas Piping
23 20 00.00.01 - HVAC Piping and Pumps
23 21 13.23 - Aboveground Hydronic Piping
23 22 13 - Steam and Condensate Heating Piping
23 22 13.23 - Aboveground Steam and Condensate Heating Piping
23 24 16 - Internal-Combustion Engine Exhaust Piping
23 30 00.00.01 - HVAC Air Distribution
23 50 00.00.01 - Central Heating Equipment
23 52 33.19 - Copper Water-Tube Boilers
23 52 13 - Electric Boilers
23 52 16 - Condensing Boilers
23 52 16.13 - Stainless-Steel Condensing Boilers
23 52 16.16 - Aluminum Condensing Boilers
23 52 19 - Pulse Combustion Boilers
23 52 23 - Cast-Iron Boilers
23 52 33 - Water-Tube Boilers
23 52 33.13 - Finned Water-Tube Boilers
23 52 33.16 - Steel Water-Tube Boilers
23 52 39 - Fire-Tube Boilers
23 52 39.13 - Scotch Marine Boilers
23 52 39.16 - Steel Fire-Tube Boilers
23 53 16 - Deaerators
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
40 01 10 - Operation and Maintenance of Gas and Vapor Process Piping
40 01 20 - Operation and Maintenance of Liquids Process Piping
40 01 40 - Operation and Maintenance of Process Piping and Equipment Protection
40 05 13 - Common Work Results for Process Piping
40 05 13.13 - Steel Process Piping
40 05 13.16 - Lined or Internally-Coated Steel Process Piping
40 05 13.19 - Stainless-Steel Process Piping
40 05 13.23 - Aluminum Alloys Process Piping
40 05 13.33 - Brass, Bronze, Copper, and Copper Alloys Process Piping
40 05 13.43 - Nickel and Nickel Alloys Process Piping
40 05 13.53 - Ductile, Malleable, and Cast Iron Alloys Process Piping
40 05 13.63 - Titanium and Titanium Alloys Process Piping
40 05 13.73 - Plastic Process Piping
40 05 13.76 - Fiberglass-Reinforced Plastic and Resins Process Piping
40 05 13.93 - Other Metals Process Piping
40 06 10 - Schedules for Gas and Vapor Process Piping
40 06 20 - Schedules for Liquids Process Piping
40 06 30 - Schedules for Solid and Mixed Materials Piping and Chutes
40 06 40 - Schedules for Process Piping and Equipment Protection
40 10 00.00.01 - Gas and Vapor Process Piping
40 11 13 - Low-Pressure Steam Process Piping
40 11 16 - Intermediate-Pressure Steam Process Piping
40 11 19 - High-Pressure Steam Process Piping
40 11 23 - Condensate Process Piping
40 12 13 - Breathing Compressed Air Process Piping
40 12 16 - Non-Breathing Compressed Air Process Piping
40 13 13 - Argon Process Piping
40 13 16 - Carbon-Dioxide Process Piping
40 13 19 - Helium Process Piping
40 13 23 - Krypton Process Piping
40 13 26 - Neon Process Piping
40 13 29 - Nitrogen Process Piping
40 13 33 - Xenon Process Piping
40 13 93 - Mixed Inert Gases Process Piping
40 14 16 - Blue (Water) Fuel Gas Piping
40 14 19 - Butane Piping
40 14 23 - Carbon-Monoxide Piping
40 14 26 - Chlorine Fuel Gas Piping
40 14 33 - Ethane-Gas Piping
40 14 36 - Hydrogen Fuel Gas Piping
40 14 39 - Liquid Natural-Gas Process Piping
40 14 43 - Methylacetylene-Propadiene Fuel Gas Piping
40 14 49 - Natural-Gas Process Piping
40 14 49.13 - Synthetic Natural-Gas Piping
40 14 49.23 - Propane-Air Mixes Fuel Gas Piping
40 14 53 - Octane Fuel Gas Piping
40 14 59 - Propane Fuel Gas Process Piping
40 14 63 - Sewage Fuel Gas Piping
40 14 93 - Mixed Fuel Gases Piping
40 15 13 - Combustion Air Piping
40 15 16 - Oxygen Combustion System Gas Piping
40 15 23 - Exothermic-Gas Combustion System Piping
40 15 26 - Endothermic-Gas Combustion System Piping
40 15 29 - Disassociated-Ammonia-Gas Combustion System Piping
40 16 13 - Ammonia Gas Piping
40 16 16 - Boron Gas Piping
40 16 26 - Diborane Gas Piping
40 16 29 - Fluorine Gas Piping
40 16 33 - Hydrogen Sulfide Gas Piping
40 16 36 - Nitrous-Oxide Gas Process Piping
40 16 39 - Ozone Gas Piping
40 16 43 - Phosphine Gas Piping
40 16 46 - Silane Gas Piping
40 16 49 - Sulfur-Dioxide Gas Piping
40 16 53 - Specialty Gas Mixtures Piping
40 18 13 - Low-Vacuum Systems Process Piping
40 18 16 - High-Vacuum Systems Process Piping
40 20 00.00.01 - Liquids Process Piping
40 21 13 - Bio Fuels Process Piping
40 22 16 - Light-Fractions Petroleum Products Piping
40 23 13 - De-Ionized Water Process Piping
40 23 16 - Distilled-Water Process Piping
40 23 19 - Process Plant Water Piping
40 23 23 - Potable Water Process Piping
40 23 29 - Recirculated Water Process Piping
40 23 33 - Reverse-Osmosis Water Process Piping
40 24 13 - Alcohol Piping
40 24 16 - Gel Piping
40 24 19 - Slurries Process Piping
40 24 23 - Thixotropic Liquid Piping
40 25 13 - Liquid Acids Piping
40 25 16 - Liquid Bases Piping
40 26 00.00.01 - Liquid Polymer Piping
40 95 73 - Process Control Wiring
41 01 40 - Operation and Maintenance of Container Processing and Packaging
41 01 60 - Operation and Maintenance of Mobile Plant Equipment
41 06 40 - Schedules for Container Processing and Packaging
41 06 50 - Schedules for Material Storage
41 06 60 - Schedules for Mobile Plant Equipment
41 08 10 - Commissioning of Bulk Material Processing Equipment
41 08 20 - Commissioning of Piece Material Handling Equipment
41 08 40 - Commissioning of Container Processing and Packaging
41 08 50 - Commissioning of Material Storage
41 08 60 - Commissioning of Mobile Plant Equipment
42 11 13 - Low-Pressure Process Boilers
42 11 16 - Intermediate-Pressure Process Boilers
42 11 19 - High-Pressure Process Boilers
42 11 23 - Specialty Process Boilers
42 13 26 - Industrial Solar Radiation Heat Exchangers
43 01 30 - Operation and Maintenance of Gas and Liquid Hi-Purification Equipment
48 11 13 - Fossil Fuel Electrical Power Plant Boilers

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Projects From $100,000 to $2,000,000,000
  • LEED Experience
  • BIM Experience

Gallery

Associations & Memberships

Sidney/Shelby County Chamber of Commerce
Sidney/Shelby County Chamber of Commerce
Associated Builders and Contractors
Associated Builders and Contractors

Preferred Brands

Bryant Heating & Cooling Systems
Bryant Heating & Cooling Systems
Carrier
Carrier
Daikin Air Conditioning
Daikin Air Conditioning
Liebert
Liebert
Mitsubishi
Mitsubishi
Trane
Trane
York
York
Share URL copied!
https://www.thebluebook.com/iProView/1972/slagle-mechanical/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.