Company Info

  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Our main lines of business include: Env. Engr. & Consulting--General, Site Assessments, Excavating Contractors, Hazardous Waste Management & Removal, Soil Erosion Control.

We are located in the Columbus, Ohio area.

What We Do

Commercial Experience

City / Town Hall Government Jail / Prison Storage Facility / Warehouse
Apartments & Condominiums Auto Dealership / Service Church / Synagogue Civil & Site Development Fitness Center Grocery Stores Hospital / Nursing Home Hotel / Motel House Misc Project Office Building Residential Building Restaurant Retail Store Road / Highway Sewage / Water Treatment Plant Single Family Residential Utilities

Regions & Counties Serviced

  • Cleveland - Northeastern Ohio
  • Cincinnati, Columbus, Dayton - Southern Ohio

Ohio All

Our CSI Codes

01 35 43 - Environmental Procedures
01 56 13 - Temporary Air Barriers
01 57 13 - Temporary Erosion and Sediment Control
01 78 29 - Final Site Survey
01 81 16 - Facility Environmental Requirements
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 20 00.00.01 - Assessment
02 24 13.73 - Land Assessment
02 24 23 - Chemical Sampling and Analysis of Soils
02 24 43 - Transboundary and Global Environmental Aspects Assessment
02 26 36 - Hazardous Waste Drum Assessment
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 58 13 - Snow Fencing
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
07 25 00.00.01 - Weather Barriers
07 26 13 - Above-Grade Vapor Retarders
07 26 16 - Below-Grade Vapor Retarders
07 26 23 - Below-Grade Gas Retarders
07 27 13 - Modified Bituminous Sheet Air Barriers
07 27 16 - Sheet Metal Membrane Air Barriers
07 27 19 - Plastic Sheet Air Barriers
07 27 23 - Board Product Air Barriers
07 27 26 - Fluid-Applied Membrane Air Barriers
11 92 23 - Agricultural Waste Clean-Up Equipment
23 01 60.71 - Refrigerant Recovery/Recycling
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 09 13.13 - Groundwater Monitoring During Construction
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
32 70 00.00.01 - Wetlands
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 41 16 - Levee Cutoff Trenches
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection

Project Experience

  • Service Work/Repairs

Gallery

Featured Image 1
Federal Bureau of Prisons (Department of Justice)
Featured Image 2
Federal Bureau of Prisons (Department of Justice)
Featured Image 3
NASA Plumb Brook
Featured Image 4
NASA Plumb Brook
Service Area and Locations Map for Buckeye Elm Contracting
Share URL copied!
https://www.thebluebook.com/iProView/1833847/buckeye-elm-contracting/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.