Logo

Tiger Barriers, Inc.

Share

Farmingdale, NY 11735

Company Info

  • Est. 2000
  • Size 10-19 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

What We Provide

With Tiger Barriers, you can expect us to help you with any needs your job may have. From the barrier itself, to any extra items that might be needed to accompany it.

JERSEY BARRIERS:

Tiger Barriers Inc. is an innovator in plastic jersey barrier design. After years of studying and testing numerous designs we have developed a barrier that meets or exceeds the requirements needed in the field. Our jersey barriers are both versatile and durable! Our inventory includes over 5000 plastic jersey barriers in stock and ready for immediate delivery. Weighing approximately 85 lbs. empty, they are easy to set up or move around a job site. 2 workers can easily set up 800 lf. plus in a day. Once filled with water, the weight can go to 650 lbs. making them an EXTREMELY stable longitudinal channelizing device  (LCD).

JERSEY BARRIER PINS:

This is used to join barriers together when barriers are being used by themselves.

BARRIER FENCING

This is a custom made chain-link fence panel. Made to fit atop of your barrier and accomplish an 8FT overall height.  

3 INCH BY 8FT STEEL PIPE

When using chainlink fencing on top of your barriers, this pipe is used to join the barriers together and also hold fencing above the barrier at the same time.

BARRIER FENCE HARDWARE KIT

This is a set of the nuts, bolts, clamps, needed to attach fence panels to the pipe.

BARRIER FENCE SCREENING

This is a cloth screening that offers privacy to the job site. It attaches with zip ties through the pre-installed grommets on the screening.

FLASHING SAFETY LIGHTS

Our barriers are pre-made to accommodate a flashing safety light, should your job require them. 

.

What We Do

Commercial Experience

Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Casinos Church / Synagogue City / Town Hall Civil & Site Development Club House / Community Center Court House Dams & Levies Data Centers - Mission Critical Design Build Education (K-12) Fire / Police Station Fitness Center Gas Station Golf Course Government Grocery Stores Historic Preservation Hospital / Nursing Home Hotel / Motel House Industrial Maintenance Jail / Prison Laboratory Library Lighting Retrofits Manufacturing Plant Marine Medical Office Military Misc Project Mixed Use Museum Non-Building Construction Non-Residential Building Office Building Park / Playground Parking Garage Parking Lots Post Office Power Generation & Distribution Pre-Manufactured Structures Radio / Television Station Renewable Energy Residential Building Restaurant Retail Store Road / Highway School / College / University Secure and Shielded Facilities Sewage / Water Treatment Plant Single Family Residential Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Theme Park Tract Housing Tunnel Utilities

Regions & Counties Serviced

  • New York City, Long Island and Hudson Valley

Connecticut All

Delaware All

District Of Columbia All

Maryland All

New Jersey All

New York 1

  • Nassau

Our CSI Codes

01 10 00.00.01 - Summary
01 11 16 - Work by Owner
01 11 13 - Work Covered by Contract Documents
01 11 19 - Purchase Contracts
01 12 13 - Summary of Contracts
01 12 16 - Work Sequence
01 12 19 - Contract Interface
01 14 13 - Access to Site
01 14 16 - Coordination with Occupants
01 14 19 - Use of Site
01 18 00.00.01 - Project Utility Sources
01 20 00.00.01 - Price and Payment Procedures
01 21 13 - Cash Allowances
01 21 16 - Contingency Allowances
01 21 19 - Testing and Inspecting Allowances
01 21 23 - Installation Allowances
01 21 26 - Product Allowances
01 21 29 - Quantity Allowances
01 21 43 - Time Allowances
01 22 13 - Unit Price Measurement
01 22 16 - Unit Price Payment
01 23 00.00.01 - Alternates
01 24 13 - Value Engineering
01 25 13 - Product Substitution Procedures
01 25 16 - Execution Substitution Procedures
01 26 13 - Requests for Interpretation
01 26 19 - Clarification Notices
01 26 33 - Minor Changes in the Work
01 26 36 - Supplemental Instructions
01 26 39 - Field Orders
01 26 43 - Amendments
01 26 46 - Construction Change Directives
01 26 49 - Work Change Directives
01 26 53 - Proposal Requests
01 26 54 - Proposal Worksheet Summaries
01 26 57 - Change Order Requests
01 26 63 - Change Orders
01 29 73 - Schedule of Values
01 29 76 - Progress Payment Procedures
01 29 83 - Payment Procedures for Testing Laboratory Services
01 30 00.00.01 - Administrative Requirements
01 31 13 - Project Coordination
01 31 16 - Multiple Contract Coordination
01 31 19 - Project Meetings
01 31 19.13 - Preconstruction Meetings
01 31 19.16 - Site Mobilization Meetings
01 31 19.23 - Progress Meetings
01 31 19.33 - Preinstallation Meetings
01 31 23 - Project Web Site
01 32 13 - Scheduling of Work
01 32 16 - Construction Progress Schedule
01 32 16.13 - Network Analysis Schedules
01 32 19 - Submittals Schedule
01 32 23 - Survey and Layout Data
01 32 26 - Construction Progress Reporting
01 32 29 - Periodic Work Observation
01 32 33 - Photographic Documentation
01 32 43 - Purchase Order Tracking
01 33 13 - Certificates
01 33 16 - Design Data
01 33 19 - Field Test Reporting
01 33 23 - Shop Drawings, Product Data, and Samples
01 33 26 - Source Quality Control Reporting
01 33 29 - Sustainable Design Reporting
01 35 13 - Special Project Procedures
01 35 13.13 - Special Project Procedures for Airport Facilities
01 35 13.16 - Special Project Procedures for Detention Facilities
01 35 13.19 - Special Project Procedures for Healthcare Facilities
01 35 13.43 - Special Project Procedures for Contaminated Sites
01 35 16 - Alteration Project Procedures
01 35 23 - Owner Safety Requirements
01 35 26 - Governmental Safety Requirements
01 35 29 - Health, Safety, and Emergency Response Procedures
01 35 29.13 - Health, Safety, and Emergency Response Procedures for Contaminated Sites
01 35 33 - Infection Control Procedures
01 35 43 - Environmental Procedures
01 35 43.13 - Environmental Procedures for Hazardous Materials
01 35 43.16 - Environmental Procedures for Toxic Materials
01 35 53 - Security Procedures
01 35 91 - Historic Treatment Procedures
01 40 00.00.01 - Quality Requirements
01 41 13 - Codes
01 41 16 - Laws
01 41 19 - Rules
01 41 23 - Fees
01 41 26 - Permits
01 42 13 - Abbreviations and Acronyms
01 42 16 - Definitions
01 42 19 - Reference Standards
01 43 13 - Manufacturer Qualifications
01 43 16 - Supplier Qualifications
01 43 19 - Fabricator Qualifications
01 43 23 - Installer Qualifications
01 43 26 - Testing and Inspecting Agency Qualifications
01 43 29 - Code-Required Special Inspector Qualifications
01 43 33 - Manufacturer’s Field Services
01 43 36 - Field Samples
01 43 39 - Mockups
01 45 13 - Source Quality Control Procedures
01 45 16 - Field Quality Control Procedures
01 45 16.13 - Contractor Quality Control
01 45 23 - Testing and Inspecting Services
01 45 26 - Plant Inspection Procedures
01 45 29 - Testing Laboratory Services
01 45 33 - Code-Required Special Inspections and Procedures
01 50 00.00.01 - Temporary Facilities and Controls
01 51 13 - Temporary Electricity
01 51 16 - Temporary Fire Protection
01 51 19 - Temporary Fuel Oil
01 51 23 - Temporary Heating, Cooling, and Ventilating
01 51 26 - Temporary Lighting
01 51 29 - Temporary Natural-Gas
01 51 33 - Temporary Telecommunications
01 51 36 - Temporary Water
01 52 13 - Field Offices and Sheds
01 52 16 - First Aid Facilities
01 52 19 - Sanitary Facilities
01 53 13 - Temporary Bridges
01 53 16 - Temporary Decking
01 53 19 - Temporary Overpasses
01 53 23 - Temporary Ramps
01 53 26 - Temporary Runarounds
01 54 13 - Temporary Elevators
01 54 16 - Temporary Hoists
01 54 19 - Temporary Cranes
01 54 23 - Temporary Scaffolding and Platforms
01 54 26 - Temporary Swing Staging
01 55 13 - Temporary Access Roads
01 55 16 - Haul Routes
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 55 26 - Traffic Control
01 55 29 - Staging Areas
01 56 13 - Temporary Air Barriers
01 56 16 - Temporary Dust Barriers
01 56 19 - Temporary Noise Barriers
01 56 23 - Temporary Barricades
01 56 26 - Temporary Fencing
01 56 29 - Temporary Protective Walkways
01 56 33 - Temporary Security Barriers
01 56 36 - Temporary Security Enclosures
01 56 39 - Temporary Tree and Plant Protection
01 57 13 - Temporary Erosion and Sediment Control
01 57 16 - Temporary Pest Control
01 57 19 - Temporary Environmental Controls
01 57 23 - Temporary Storm Water Pollution Control
01 58 13 - Temporary Project Signage
01 58 16 - Temporary Interior Signage
01 60 00.00.01 - Product Requirements
01 61 13 - Software Licensing Requirements
01 62 00.00.01 - Product Options
01 64 00.00.01 - Owner-Furnished Products
01 65 00.00.01 - Product Delivery Requirements
01 66 13 - Product Storage and Handling Requirements for Hazardous Materials
01 66 16 - Product Storage and Handling Requirements for Toxic Materials
01 70 00.00.01 - Execution and Closeout Requirements
01 71 13 - Mobilization
01 71 16 - Acceptance of Conditions
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 71 33 - Protection of Adjacent Construction
01 73 13 - Application
01 73 16 - Erection
01 73 19 - Installation
01 73 23 - Bracing and Anchoring
01 73 26 - Existing Products
01 73 29 - Cutting and Patching
01 74 13 - Progress Cleaning
01 74 16 - Site Maintenance
01 74 19 - Construction Waste Management and Disposal
01 74 23 - Final Cleaning
01 75 13 - Checkout Procedures
01 75 16 - Startup Procedures
01 76 00.00.01 - Protecting Installed Construction
01 77 13 - Preliminary Closeout Reviews
01 77 16 - Final Closeout Review
01 77 19 - Closeout Requirements
01 78 13 - Completion and Correction List
01 78 19 - Maintenance Contracts
01 78 23 - Operation and Maintenance Data
01 78 23.13 - Operation Data
01 78 23.16 - Maintenance Data
01 78 23.19 - Preventative Maintenance Instructions
01 78 29 - Final Site Survey
01 78 33 - Bonds
01 78 36 - Warranties
01 78 39 - Project Record Documents
01 78 43 - Spare Parts
01 78 46 - Extra Stock Materials
01 78 53 - Sustainable Design Closeout Documentation
01 79 00.00.01 - Demonstration and Training
01 80 00.00.01 - Performance Requirements
01 81 13 - Sustainable Design Requirements
01 81 16 - Facility Environmental Requirements
01 81 19 - Indoor Air Quality Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 83 19 - Roofing Performance Requirements
01 84 13 - Interior Construction Performance Requirements
01 84 16 - Stairways Performance Requirements
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 87 13 - Equipment Performance Requirements
01 87 16 - Furnishings Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 90 00.00.01 - Life Cycle Activities
01 91 13 - General Commissioning Requirements
01 91 16 - Facility Substructure Commissioning
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
01 91 19.73 - Roofing Commissioning
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
01 91 23.73 - Interior Finishes Commissioning
01 92 13 - Facility Operation Procedures
01 93 13 - Facility Maintenance Procedures
01 93 16 - Recycling Programs
01 94 13 - Facility Decommissioning Procedures
11 12 13 - Parking Key and Card Control Units
11 12 33 - Parking Gates
11 14 13 - Pedestrian Gates
11 14 13.16 - Rotary Gates
11 14 53 - Pedestrian Security Equipment

Project Experience

  • Union
  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Service Work/Repairs

Gallery

Featured Image 1
Jersey Barriers
Featured Image 2
Jersey Barriers
Featured Image 3
Jersey Barriers
Service Area and Locations Map for Tiger Barriers, Inc.

Associations & Memberships

OSHA - 10 Hour Construction Safety & Health 29 CFR 1926.500
OSHA - 10 Hour Construction Safety & Health 29 CFR 1926.500
Share URL copied!
https://www.thebluebook.com/iProView/1756909/tiger-barriers-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.