Featured Project

NASA Conference Room

Palmdale , CA
Scope Of Work:

This conference room had a dated projector setup that the company wanted to upgrade to a more network driven system, that allowed multi-office teleconferencing.  We installed 2 video walls (one portrait, one landscape), comprised of 3 NEC 43" Multimedia LCD Displays, 4 recessed in-ceiling speakers, an ip camera, mics for a voip system, and completed all of the wiring therein.  All connected to an off-site configured component rack.  The video walls were controlled by Crestron DMs, and could be manipulated individually, or as specified group.  

After the successful completion of this project, we were asked to do an identical installation at NASA's Edwards AFB location.  Which we did!

Client Reference:
NASA
General Contractor: Rob Kirsch
Approx Contract: $30,000
Completion: Jul 2016