Logo

The Pump & Spray Co.

Fort Myers, FL 33912

Company Info

  • Est. 2015
  • Size 10-19 Employees
  • Annual Vol Undisclosed
  • DUNS # 10-798-8910

People Also View These
Loading...

Our Story

The Pump and Spray Company Corporation is committed to providing the most reliable and cost effective solution to fix your problem. We utilize state of the art equipment and the highest quality of materials for your spray foam insulation, concrete lifting, concrete resurfacing and soil stabilization needs. Your safety, and your needs always come first. Our highly trained and experienced technicians are some of the best in the industry.  From the scheduling process, to the free estimate, to the completion of the work, we always listen, truly care about fixing problems, and serve you, our customer, with honor. If you have any questions about cracked concrete, driveway or pool deck repairs, or insulation needs, please give us a call today!  

Concrete often fails due to poor construction or soil quality, heavy machinery and wear and abuse. Cracks and lifts can lead to hazards and drainage issues. The Pump and Spray Company can fix your concrete problems with concrete foam quickly and cost effectively. Concrete lifting can be a long term and great option when you want to fix your concrete. The concrete is sinking for some reason; let us help you to figure out what is causing it.

Contact us for a free evaluation.

Pool Deck Repairs

Sidewalk Repairs

AC Pad Repairs

Driveway Repairs

Pole Barns

Commercial Buildings

Up to Sea Wall & Captains Walk Repairs

Does your seawall look like this? In Southwest Florida, this is very common due to the weather, and erosion.  When you begin to see voids appear near your seawall, you can either leave it alone and watch your grass and soil quickly wither away into the water; or you can give us a call! We specialize in void fills for seawalls. We inject a polymer foam into the ground that actually stabilizes it so things stay put.

What We Do

Commercial Experience

Misc Project
Hotel / Motel Office Building Residential Building Retail Store Single Family Residential

Regions & Counties Serviced

  • Florida-South-West Palm Beach, Miami, Naples

Florida All

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 58 13 - Snow Fencing
03 01 30.51 - Cleaning of Cast-in-Place Concrete
03 01 30.61 - Resurfacing of Cast-in-Place Concrete
03 01 30.71 - Rehabilitation of Cast-in-Place Concrete
03 01 40.51 - Cleaning of Precast Concrete
03 01 40.61 - Resurfacing of Precast Concrete
03 01 40.71 - Rehabilitation of Precast Concrete
03 01 60 - Maintenance of Grouting
03 35 13 - High-Tolerance Concrete Floor Finishing
03 47 16 - Lift-Slab Concrete
07 01 20 - Maintenance of Thermal Protection
07 06 20 - Schedules for Thermal Protection
07 18 13 - Pedestrian Traffic Coatings
07 20 00.00.01 - Thermal Protection
09 01 60 - Maintenance of Flooring
09 60 00.00.01 - Flooring
09 61 13 - Slip-Resistant Flooring Treatment
09 62 26 - Leather Flooring
09 67 19 - Magnesium-Oxychloride Flooring
09 96 35 - Chemical-Resistant Coatings
09 96 53 - Elastomeric Coatings
09 97 26.13 - Interior Cementitious Coatings
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 43 19 - Mechanical Jacking
31 48 23 - Jacked Piers
31 72 13 - Rock Reinforcement and Initial Support
32 11 33 - Cement-Treated Base Courses
32 32 34 - Reinforced Soil Retaining Walls
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 35 - Slope Protection Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 35 - Slope Protection Scour Protection

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Service Work/Repairs

Gallery

Featured Image 1
Resurfacing
Featured Image 2
Concrete Lifting
Featured Image 3
Spray Foam Insulation
Featured Image 4
Sample Boards

Preferred Brands

Rubbermaid
Rubbermaid
Gaco Western Inc.
Gaco Western Inc.
H&C
H&C
Surecrete
Surecrete
Torginol
Torginol
Tnemec
Tnemec
Share URL copied!
https://www.thebluebook.com/iProView/1584950/the-pump-spray-co/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.