Brookfield Floating Bridge Replacement

Project Information

Project Location:
Brookfield, VT
Status:
Completed
Structure Type:
Bridge

Scope Of Work

T.Y. Lin International (TYLI) served as the prime design consultant for the Brookfield Floating Bridge Replacement Project in Brookfield, Vermont.

One of only a handful of floating bridges in the world and listed in the National Register of Historic Places, the first Brookfield Floating Bridge was constructed in 1820. After the seventh-generation structure was closed in 2007 due to leaking flotation devices and deteriorating timber, local residents lobbied that the important local attraction - which only carries about 110 vehicles each day – be rebuilt.

TYLI engineers successfully overcame numerous project challenges, including the incorporation of four major structural materials (FRP, timber, concrete, and steel), the lack of design standards for FRP and floating bridges, and a 100-year design life mandate, which proved difficult in an aquatic environment.

The new Brookfield Floating Bridge opened on time and on budget. The bridge measures approximately 321 feet long and carries a single lane of alternating traffic and two flanking, 5-foot-wide pedestrian sidewalks.

PROJECT HIGHLIGHTS:

TYLI developed project-specific design criteria to address unique loading conditions and serviceability constraints, among other aspects, relying heavily on research papers, guides, and draft design codes prepared under American Society of Civil Engineers (ASCE) specifications.

The new flotation system consists of 10, 11-foot-wide and 51-foot-long, FRP pontoons, tied together into a monolithic float through the use of high-strength rods and steel splice plates.

Historic constraints required the use of timber for the deck, railing, and ramp system to echo the appearance of previous structures. The articulating approach ramps are composed of glued laminated timber beams.

The bearings and hinged expansion plates were specially designed and detailed to accommodate large movements caused by lake level fluctuations.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1566243/t-y-lin-international/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.