Logo

Lean Safety Consultancy, Co.

Amelia, OH 45102

Company Info

  • Est. 2015
  • Size 10-19 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Could you benefit from a straightforward and direct answer on environmental health & safety concerns?

Here you have an Independent Consultant with over 15 years experience in the environmental health safety and quality sector with strong capability working with the Construction, Oil & Gas, Chemical, and General (Manufacturing( Industries on performance transformation initiatives. 
 
I enjoy helping executives of medium to large businesses address their legal obligations to maintain compliance with Global, Federal, State, Local laws and ordinances. I supersede the standards and regulations of NEBOSH, IOSH, OSHA, Cal/OSHA, EPA, DOT, NFPA, IAFF, LEED, ISO, and Lean Six Sigma to protect the health, safety, and welfare of the worker and consistently operate an incident free safety program. With this being a fact, I help company's secure contracts and become industry leaders in environmental health and safety. ?

Producer and provider of a safety management process and training that is customized to fit the needs of each and every company contract. My safety management process systematically builds the confidence of your team leader's, and your business becomes collectively responsible, accountable, and will think "safety first".

All my work is underpinned with keeping "health and safety simple".

While the safety management process provides the framework, my ongoing support such as;

 • Safety Training,
 • Coaching and Mentoring,
 • Safety Meeting Facilitation,
 • Workplace Inspections,
 • Incident Investigations,
 • Contractor Management,
 • Emergency Drills,
 • Auditing,
 • Benchmark Reporting,

makes a workplace with incident free and continuous improvement your reality . 

Truly an environmental health & safety savant who specializes in the development of people, businesses, and their environmental health & safety success. 

My personable approach makes it easy to understand the legalities for environmental health & safety, and how to implement the best practices applicable for business.

The consulting services provided by Lean Safety Consultancy are client specific and our firm’s structure allows companies the opportunity of outsourcing particular expertise.

 

What We Do

Commercial Experience

Misc Project
Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Casinos Church / Synagogue City / Town Hall Civil & Site Development Club House / Community Center Court House Dams & Levies Data Centers - Mission Critical Design Build Education (K-12) Fire / Police Station Fitness Center Gas Station Golf Course Government Grocery Stores Historic Preservation Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Laboratory Library Manufacturing Plant Marine Medical Office Military Mixed Use Museum Non-Building Construction Non-Residential Building Office Building Park / Playground Parking Garage Parking Lots Post Office Power Generation & Distribution Pre-Manufactured Structures Radio / Television Station Renewable Energy Residential Building Restaurant Retail Store Road / Highway School / College / University Secure and Shielded Facilities Sewage / Water Treatment Plant Storage Facility / Warehouse Swimming Pool Tennis Court Terminal - Airport / Bus / Railroad Theater Theme Park Tunnel Utilities

Regions & Counties Serviced

  • Cincinnati, Columbus, Dayton - Southern Ohio

Indiana All

Kentucky All

Ohio All

Our CSI Codes

01 10 00.00.01 - Summary
01 11 16 - Work by Owner
01 11 13 - Work Covered by Contract Documents
01 11 19 - Purchase Contracts
01 12 13 - Summary of Contracts
01 12 16 - Work Sequence
01 12 19 - Contract Interface
01 14 13 - Access to Site
01 14 16 - Coordination with Occupants
01 14 19 - Use of Site
01 18 00.00.01 - Project Utility Sources
01 20 00.00.01 - Price and Payment Procedures
01 21 13 - Cash Allowances
01 21 16 - Contingency Allowances
01 21 19 - Testing and Inspecting Allowances
01 21 23 - Installation Allowances
01 21 26 - Product Allowances
01 21 29 - Quantity Allowances
01 21 43 - Time Allowances
01 22 13 - Unit Price Measurement
01 22 16 - Unit Price Payment
01 23 00.00.01 - Alternates
01 24 13 - Value Engineering
01 25 13 - Product Substitution Procedures
01 25 16 - Execution Substitution Procedures
01 26 13 - Requests for Interpretation
01 26 19 - Clarification Notices
01 26 33 - Minor Changes in the Work
01 26 36 - Supplemental Instructions
01 26 39 - Field Orders
01 26 43 - Amendments
01 26 46 - Construction Change Directives
01 26 49 - Work Change Directives
01 26 53 - Proposal Requests
01 26 54 - Proposal Worksheet Summaries
01 26 57 - Change Order Requests
01 26 63 - Change Orders
01 29 73 - Schedule of Values
01 29 76 - Progress Payment Procedures
01 29 83 - Payment Procedures for Testing Laboratory Services
01 30 00.00.01 - Administrative Requirements
01 31 13 - Project Coordination
01 31 16 - Multiple Contract Coordination
01 31 19 - Project Meetings
01 31 19.13 - Preconstruction Meetings
01 31 19.16 - Site Mobilization Meetings
01 31 19.23 - Progress Meetings
01 31 19.33 - Preinstallation Meetings
01 31 23 - Project Web Site
01 32 13 - Scheduling of Work
01 32 16 - Construction Progress Schedule
01 32 16.13 - Network Analysis Schedules
01 32 19 - Submittals Schedule
01 32 23 - Survey and Layout Data
01 32 26 - Construction Progress Reporting
01 32 29 - Periodic Work Observation
01 32 33 - Photographic Documentation
01 32 43 - Purchase Order Tracking
01 33 13 - Certificates
01 33 16 - Design Data
01 33 19 - Field Test Reporting
01 33 23 - Shop Drawings, Product Data, and Samples
01 33 26 - Source Quality Control Reporting
01 33 29 - Sustainable Design Reporting
01 35 13 - Special Project Procedures
01 35 13.13 - Special Project Procedures for Airport Facilities
01 35 13.16 - Special Project Procedures for Detention Facilities
01 35 13.19 - Special Project Procedures for Healthcare Facilities
01 35 13.43 - Special Project Procedures for Contaminated Sites
01 35 16 - Alteration Project Procedures
01 35 23 - Owner Safety Requirements
01 35 26 - Governmental Safety Requirements
01 35 29 - Health, Safety, and Emergency Response Procedures
01 35 29.13 - Health, Safety, and Emergency Response Procedures for Contaminated Sites
01 35 33 - Infection Control Procedures
01 35 43 - Environmental Procedures
01 35 43.13 - Environmental Procedures for Hazardous Materials
01 35 43.16 - Environmental Procedures for Toxic Materials
01 35 53 - Security Procedures
01 35 91 - Historic Treatment Procedures
01 40 00.00.01 - Quality Requirements
01 41 13 - Codes
01 41 16 - Laws
01 41 19 - Rules
01 41 23 - Fees
01 41 26 - Permits
01 42 13 - Abbreviations and Acronyms
01 42 16 - Definitions
01 42 19 - Reference Standards
01 43 13 - Manufacturer Qualifications
01 43 16 - Supplier Qualifications
01 43 19 - Fabricator Qualifications
01 43 23 - Installer Qualifications
01 43 26 - Testing and Inspecting Agency Qualifications
01 43 29 - Code-Required Special Inspector Qualifications
01 43 33 - Manufacturer’s Field Services
01 43 36 - Field Samples
01 43 39 - Mockups
01 45 13 - Source Quality Control Procedures
01 45 16 - Field Quality Control Procedures
01 45 16.13 - Contractor Quality Control
01 45 23 - Testing and Inspecting Services
01 45 26 - Plant Inspection Procedures
01 45 29 - Testing Laboratory Services
01 45 33 - Code-Required Special Inspections and Procedures
01 50 00.00.01 - Temporary Facilities and Controls
01 51 13 - Temporary Electricity
01 51 16 - Temporary Fire Protection
01 51 19 - Temporary Fuel Oil
01 51 23 - Temporary Heating, Cooling, and Ventilating
01 51 26 - Temporary Lighting
01 51 29 - Temporary Natural-Gas
01 51 33 - Temporary Telecommunications
01 51 36 - Temporary Water
01 52 13 - Field Offices and Sheds
01 52 16 - First Aid Facilities
01 52 19 - Sanitary Facilities
01 53 13 - Temporary Bridges
01 53 16 - Temporary Decking
01 53 19 - Temporary Overpasses
01 53 23 - Temporary Ramps
01 53 26 - Temporary Runarounds
01 54 13 - Temporary Elevators
01 54 16 - Temporary Hoists
01 54 19 - Temporary Cranes
01 54 23 - Temporary Scaffolding and Platforms
01 54 26 - Temporary Swing Staging
01 55 13 - Temporary Access Roads
01 55 16 - Haul Routes
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 55 26 - Traffic Control
01 55 29 - Staging Areas
01 56 13 - Temporary Air Barriers
01 56 16 - Temporary Dust Barriers
01 56 19 - Temporary Noise Barriers
01 56 23 - Temporary Barricades
01 56 26 - Temporary Fencing
01 56 29 - Temporary Protective Walkways
01 56 33 - Temporary Security Barriers
01 56 36 - Temporary Security Enclosures
01 56 39 - Temporary Tree and Plant Protection
01 57 13 - Temporary Erosion and Sediment Control
01 57 16 - Temporary Pest Control
01 57 19 - Temporary Environmental Controls
01 57 23 - Temporary Storm Water Pollution Control
01 58 13 - Temporary Project Signage
01 58 16 - Temporary Interior Signage
01 60 00.00.01 - Product Requirements
01 61 13 - Software Licensing Requirements
01 62 00.00.01 - Product Options
01 64 00.00.01 - Owner-Furnished Products
01 65 00.00.01 - Product Delivery Requirements
01 66 13 - Product Storage and Handling Requirements for Hazardous Materials
01 66 16 - Product Storage and Handling Requirements for Toxic Materials
01 70 00.00.01 - Execution and Closeout Requirements
01 71 13 - Mobilization
01 71 16 - Acceptance of Conditions
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 71 33 - Protection of Adjacent Construction
01 73 13 - Application
01 73 16 - Erection
01 73 19 - Installation
01 73 23 - Bracing and Anchoring
01 73 26 - Existing Products
01 73 29 - Cutting and Patching
01 74 13 - Progress Cleaning
01 74 16 - Site Maintenance
01 74 19 - Construction Waste Management and Disposal
01 74 23 - Final Cleaning
01 75 13 - Checkout Procedures
01 75 16 - Startup Procedures
01 76 00.00.01 - Protecting Installed Construction
01 77 13 - Preliminary Closeout Reviews
01 77 16 - Final Closeout Review
01 77 19 - Closeout Requirements
01 78 13 - Completion and Correction List
01 78 19 - Maintenance Contracts
01 78 23 - Operation and Maintenance Data
01 78 23.13 - Operation Data
01 78 23.16 - Maintenance Data
01 78 23.19 - Preventative Maintenance Instructions
01 78 29 - Final Site Survey
01 78 33 - Bonds
01 78 36 - Warranties
01 78 39 - Project Record Documents
01 78 43 - Spare Parts
01 78 46 - Extra Stock Materials
01 78 53 - Sustainable Design Closeout Documentation
01 79 00.00.01 - Demonstration and Training
01 80 00.00.01 - Performance Requirements
01 81 13 - Sustainable Design Requirements
01 81 16 - Facility Environmental Requirements
01 81 19 - Indoor Air Quality Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 83 19 - Roofing Performance Requirements
01 84 13 - Interior Construction Performance Requirements
01 84 16 - Stairways Performance Requirements
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 87 13 - Equipment Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 90 00.00.01 - Life Cycle Activities
01 91 13 - General Commissioning Requirements
01 91 16 - Facility Substructure Commissioning
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
01 91 19.73 - Roofing Commissioning
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
01 92 13 - Facility Operation Procedures
01 93 13 - Facility Maintenance Procedures
01 93 16 - Recycling Programs
01 94 13 - Facility Decommissioning Procedures
02 01 50 - Maintenance of Site Remediation
02 01 65 - Maintenance of Underground Storage Tank Removal
02 01 80 - Maintenance of Facility Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 06 30.13 - Boring or Test Pit Log Schedule
02 06 50 - Schedules for Site Remediation
02 06 65 - Schedules for Underground Storage Tank Removal
02 06 80 - Schedules for Facility Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 08 00.00.01 - Commissioning of Existing Conditions
02 20 00.00.01 - Assessment
02 21 13 - Site Surveys
02 21 13.13 - Boundary and Survey Markers
02 21 16 - Measured Drawings
02 22 13 - Movement and Vibration Assessment
02 22 16 - Acoustic Assessment
02 22 19 - Traffic Assessment
02 22 23 - Accessibility Assessment
02 24 13 - Natural Environment Assessment
02 24 13.13 - Air Assessment
02 24 13.43 - Water Assessment
02 24 13.73 - Land Assessment
02 24 23 - Chemical Sampling and Analysis of Soils
02 24 43 - Transboundary and Global Environmental Aspects Assessment
02 25 16 - Existing Concrete Assessment
02 25 16.13 - Concrete Assessment Drilling
02 25 19 - Existing Masonry Assessment
02 25 19.13 - Masonry Assessment Drilling
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 25 29 - Existing Thermal and Moisture Protection Assessment
02 25 29.13 - Waterproofing Investigations
02 25 29.23 - Roofing Investigations
02 26 23 - Asbestos Assessment
02 26 26 - Lead Assessment
02 26 29 - Polychlorinate Biphenyl Assessment
02 26 33 - Biological Assessment
02 26 33.13 - Mold Assessment
02 26 36 - Hazardous Waste Drum Assessment
02 30 00.00.01 - Subsurface Investigation
02 31 13 - Seismic Investigations
02 31 16 - Gravity Investigations
02 31 19 - Magnetic Investigations
02 31 23 - Electromagnetic Investigations
02 31 26 - Electrical Resistivity Investigations
02 31 29 - Magnetotelluric Investigations
02 32 13 - Subsurface Drilling and Sampling
02 32 16 - Material Testing
02 32 19 - Exploratory Excavations
02 32 23 - Geotechnical Monitoring Before Construction
02 32 23.13 - Groundwater Monitoring Before Construction
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.13 - Paving Removal
02 41 13.23 - Utility Line Removal
02 41 13.33 - Railtrack Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 43 13 - Structure Relocation
02 43 13.13 - Building Relocation
02 43 16 - Structure Raising
02 43 16.13 - Building Raising
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 51 29 - Surface Cleaning Decontamination
02 51 29.13 - High-Pressure Water Cleaning Decontamination
02 51 29.16 - Vacuum Sweeping Cleaning Decontamination
02 51 33 - Surface Removal Decontamination
02 51 33.13 - Surface Removal Decontamination by Grinding
02 51 33.16 - Surface Removal Decontamination by Sand Blasting
02 51 33.19 - Surface Removal Decontamination by Ultrasound
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 13 - Incineration Decontamination
02 53 13.13 - Remediation of Contaminated Soils and Sludges by Incineration
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 13 - Aerobic Processes Decontamination
02 54 16 - Anaerobic Processes Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 13.13 - Geomembrane Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
02 57 16 - Sinkhole Remediation by Backfilling
02 58 13 - Snow Fencing
02 58 16 - Snow Avalanche Control
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 26 - Removal and Disposal of Asbestos Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 65 00.00.01 - Underground Storage Tank Removal
02 66 00.00.01 - Landfill Construction and Storage
02 70 00.00.01 - Water Remediation
02 71 00.00.01 - Groundwater Treatment
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 80 00.00.01 - Facility Remediation
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 82 13 - Asbestos Abatement
02 82 13.13 - Glovebag Asbestos Abatement
02 82 13.16 - Precautions for Asbestos Abatement
02 82 13.19 - Asbestos Floor Tile and Mastic Abatement
02 82 16 - Engineering Control of Asbestos Containing Materials
02 82 33 - Removal and Disposal of Asbestos Containing Materials
02 83 13 - Lead Hazard Control Activities
02 83 19 - Lead-Based Paint Remediation
02 83 19.13 - Lead-Based Paint Abatement
02 83 33 - Removal and Disposal of Material Containing Lead
02 83 33.13 - Lead-Based Paint Removal and Disposal
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 85 13 - Precautions for Mold Remediation
02 85 16 - Mold Remediation Preparation and Containment
02 85 19 - Mold Remediation Clearance Air Sampling
02 85 33 - Removal and Disposal of Materials with Mold
02 86 00.00.01 - Hazardous Waste Drum Handling
31 21 16 - Methane Mitigation
44 08 10 - Commissioning of Air Pollution Control

Project Experience

  • Service Work/Repairs

Gallery

Services
Services

Associations & Memberships

SPE (Society of Petroleum Engineers)
SPE (Society of Petroleum Engineers)
Share URL copied!
https://www.thebluebook.com/iProView/1559738/lean-safety-consultancy-co/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.